Laserfiche WebLink
FINAL DRAFT REVISED ALAMEDA COUNTY SOLID WASTE MANAGEMENT PLAN <br /> <br /> PLAN BACKGROUND <br /> <br /> The California Solid Waste Management and Resource Recovery Act of 1972, as <br /> amended, requires each county to adopt a county solid waste management plan <br /> and to review and revise that plan, as appropriate, at least every three years. <br /> Under the law, the county board of supervisors prepares the plan, which must <br /> be approved by the cities and by the California Waste Management Board (CWMB). <br /> <br /> Under the 1976 Joint Powers Agreement, the Alameda County Board of Supervisors <br /> designated the Solid Waste Management Authority to be responsible for preparing <br /> and maintaining the plan in this county. <br /> <br /> Alameda CoUnty adopted a Policy Plan in 1976, a Short-Term Facilities Plan in <br /> 1977 and a Medium- and Long-Term Facilities Plan in 1978. These documents made <br /> up the first Alameda County Solid Waste Management Plan. In 1982, the three <br /> plans were revised and consolidated into the current County Plan. <br /> <br /> Since 1982, the Authority has amended the Facilities Program within the County <br /> Plan but has not changed basic Plan policies or updated material in the Plan. <br /> Under the Authority JPA, changes to the Facilities Program may be made by the <br /> Authority Board; member agencies must adopt any changes to basic plan policies. <br /> <br /> In late 1985, the Authority prepared a Plan Review Report which was accepted by <br /> the CWMB. The report identified areas in the County Plan which needed to be <br /> updated or revised. The report was the basis for subsequent plan work. <br /> <br />The firm of Black & Veatch was retained in April, 1986 to prepare the Revised <br />Plan under direction of the Authority's Plan Review Committee. In April, 1987 <br />a Preliminary Draft Plan was transmitted to concerned parties including member <br />agencies of the Authority. Comments were received and evaluated by the Plan <br />Review Committee and the consultant was directed to prepare a Final Draft. <br /> <br />On July 29, 1987 the Authority certified the Negative Declaration and approved <br />the Final Draft Plan. It directed that the Final Draft be transmitted to the <br />member agencies for approval. <br /> <br /> PI. AN SUMMARY <br /> <br />Figure III-1, showing the location of existing solid waste facilities in <br />Alameda County and Figure III-2, showing the implementation schedule for <br />proposed new facilities, are attached. <br /> <br />Major features of the Final Draft Plan are as follows: <br /> <br />In Chapter II, the draft Plan provides new policies to support a large-scale <br />waste-to-energy plant, recovery of 75% of county waste by materials/energy <br />recovery by the year 2005, 50-year continuous landfill capacity, minimal land- <br />fill disposal of hazardous wastes, and priority to handling Alameda County <br />water treatment and wastewater treatment plant sludge. <br /> <br /> <br />