My WebLink
|
Help
|
About
|
Sign Out
CCMIN091905
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2005
>
CCMIN091905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2007 10:56:42 AM
Creation date
11/17/2005 11:57:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
9/19/2005
DOCUMENT NO
CCMIN091905
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />corporate user, which could include uses such as an amphitheater, volleyball court or <br />pleasant open green space. <br /> Mr. Fialho said there were two items that drove the use on the Pleasanton side <br />which were the zoning and CC&R's established by the developer of the Stoneridge Mall. <br /> Mr. Sullivan asked if a bus drop off was included on the Pleasanton and Dublin <br />sides? <br /> Mr. Russell said yes. He noted that there are additional bus locations on the <br />Dublin side as there are three to four routes on the Dublin side. <br /> Mr. Sullivan asked if Pleasanton's traffic model for its General Plan update <br />included traffic for the BART Station? <br /> Pleasanton staff said yes. <br /> In response to an inquiry by Mr. Sullivan, Mr. Russell said the main exterior <br />building material would be "Kal-Wall," a fiberglass-like material that is translucent and <br />off-white in color. <br /> Dublin Councilmember Tony Oravtez was concerned about construction. He <br />asked if construction would begin in January? <br /> Mr. Russell said yes. <br /> Mr. Oravetz asked if construction would occur at night in order to eliminate <br />holding up traffic? <br /> Mr. Russell said Ampelon is working with CalTrans with regard to the road <br />conditions. Construction work will entail moving traffic out on to the shoulder of the <br />highway to construct a majority of the station and would not include eliminating a lane of <br />traffic. He noted there would be some lane closures at midnight, which would occur <br />when the bridges are installed. <br /> Mr. Oravtez asked if Pleasanton and Dublin Councils would be informed of lane <br />closures and asked how long the construction of the Station would occur? <br /> Mr. Russell said the construction of the Station would take approximately two <br />years. He noted that lane closures would only occur with the actual structural steel work <br />and the exterior skin. <br /> Mr. Oravetz inquired about the look of the "Kal-Wall" main exterior building at <br />night. <br />Joint PleasantonlDublin City Council 3 09/19/05 <br />Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.