Laserfiche WebLink
REVISED <br /> EXHIBIT A <br /> <br /> SCOPE OF SERVICES <br /> DESIGN OF CROSS-TOWN SANITARY SEWER INTERCEPTOR <br /> <br /> It was determined in the Sewer Master Plan prepared for the <br />City of Pleasanton (City) that a cross-town sanitary .sewer <br />interceptor is required to relieve hydraulic deficiencies in the <br />existing collection system and to provide capacity for future <br />development in southeastern Pleasanton. The proposed interceptor <br />will eliminate the needs for Pumping Stations 1 and 2 and provide a <br />more direct route for the wastewater to the Dublin San Ramon <br />Services District wastewater treatment plant. The purpose of this <br />project is to provide preliminary engineering design information, <br />detailed design, and bid and construction period services for the <br />construction of the cross-town interceptor. <br /> <br />I. PLANNED ENGINEERING SERVICES <br /> <br /> The following tasks constitute planning engineering <br />services. <br /> <br />Task 1--Preliminary Design Report <br /> <br /> 1.1 Review Predesign Data and Develop Project Design <br /> Schedule <br /> <br /> a. Meet with City staff at an initial kick-off <br /> meeting to further define project needs. <br /> <br /> b. Develop a detailed design schedule in coordination <br /> with City staff and in accordance with project <br /> needs. <br /> <br /> c. Review "City of Pleasanton Sewer Master Plan" and <br /> "Sewer Improvement Requirements for the Proposed <br /> Pleasanton General Plan". <br /> <br /> d. Review as-built drawings and/or maps supplied by <br /> the City, of PS1, PS2, PS4, PS6, and sewers to be <br /> connected to the proposed cross-town interceptor. <br /> <br /> Revised <br /> Exhibit A <br /> City of Pleasanton <br /> April 5, 1988 <br /> Page 1 of 8 <br /> <br /> <br />