My WebLink
|
Help
|
About
|
Sign Out
RES 88143
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2012 3:54:40 PM
Creation date
12/4/1999 12:37:37 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/5/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Other Direct Costs. Direct expenses are charges, other <br /> than those included in time-related charges, incurred <br /> directly for Project. Direct expenses incurred by <br /> Engineer shall be billed at actual purchase price plus <br /> a service charge of 10 percent. Subcontracted services <br /> shall be billed at cost plus a service charge of <br /> 15 percent. Direct expenses include, but are not <br /> limited to: <br /> <br /> a. Services directly applicable to the work such as <br /> special legal and accounting expenses; computer <br /> rental and programming costs; special consultants; <br /> borings; laboratory charges; commercial printing <br /> and binding; and similar costs that are not <br /> applicable to general overhead. <br /> <br /> b. Identifiable reproduction costs applicable to the <br /> work such as printing of drawings, photostating, <br /> multilithing, printing, and similar costs. <br /> <br /> c. Identifiable communication expenses such as long- <br /> distance telephone, telecopying, telegraph, cable, <br /> express charges, and postage other than for general <br /> correspondence. <br /> <br /> d. Living and traveling expenses of employees when <br /> away from home office on business connected with <br /> work. <br /> <br /> e. Automobile expenses at Engineer's current mileage <br /> rate of $0.25 per mile. <br /> <br /> f. Subcontracted services. <br /> <br />II. COMPENSATION SCHEDULE <br /> <br /> For each task authorized under this Agreement, Compensation <br />shall be in accordance with the applicable portions of this <br />Agreement and the following schedule: <br /> <br /> A. PLANNING ENGINEERING TASKS <br /> <br /> Task No. Cost Ceiling <br /> <br /> 1 (except 1.3) $ 44,300 <br /> Subtask'l.3 5,700 <br /> 2 239,000 <br /> 3 12,000 <br /> <br /> Revised <br /> Exhibit B <br /> City of Pleasanton <br /> April 5, 1988 <br /> Page 2 of 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.