Laserfiche WebLink
" 301' "' <br /> <br /> Schools (ADA) .~2 .44 .86 <br /> <br /> Industrial: <br /> (Fairgrounds, Cheese Factory, <br /> Winery, Kaiser, Septic Haulers) <br /> <br /> Demand: <br /> Flow MGD $19,488.04 $29,30?.52 $48,?95.56 <br /> B0D lb/day 3.31 - 3.31 <br /> SS lb/day 2.0? - 2.0? <br /> <br /> Loading: <br /> Volume MGD 130.96 309.81 440.?? <br /> BOD 1,000 lb 57.92 - 57.92 <br /> SS 1,000 lb 30.48 - 30.48 <br /> Connection - each 1.21 1.52 2.73 <br /> <br />~. the Sewer Connection Fee be increased to correspond with the DSRSD Connection Fee <br />L~ as follows: <br /> Single Family Dwelling <br />[] (includes duplexes, townhouses, <br />C~ and condominiums) $2,100.00 <br /> <br /> Apartment or other Multiple <br /> Family dwellings per unit 1,575.00 <br /> <br /> Each commercial, industrial or <br /> institutional structure computed based upon the strength and/or <br /> volume of sewage computed on an equivalent <br /> basis to that for a single family dwelling <br /> ' unit <br /> <br /> bimonthly pretreatment program charges: <br /> <br /> Description Amount <br /> Connection Charge/Analysis $923,60 <br /> General (BOD, COD, SS and pH) 8.40 <br /> Grease and Oil 3.70 <br /> Metals 128.75 <br /> Radioactivity 120.00 <br /> Phenol 53.85 <br /> Cyanide 37.00 <br /> Other Actual Cost <br /> <br /> be introduced. <br /> The roll call vote was as follows: <br /> AYES: Councilmembers Brandes, Mohr, Wood, and Vice Mayor Mercer <br /> NOES: None <br /> ABSENT: Mayor Butler <br /> <br /> Matters for the Information of the Council <br /> Mr. Harris presented his Information Report (IR 83:16) dated June 7~ 1983, re- <br /> garding Livermore-Pleasanton BART Extension Study, and transmitting Interim Report <br /> No. 1 which includes an analysis of conceptual design features for the BART extension <br /> to Pleasanton, Dublin, and Livermore. No action was required or taken by Council on <br /> this item. <br /> <br /> 9. 6/14/83 <br /> <br /> <br />