Laserfiche WebLink
TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> <br /> ARTICLE 1 schedule or construction budget, the Architect shall prepare, <br /> for approval by the Owner. Design Development Documents <br /> ARCHITECT'S RESPONSIBILITIES consisting or' drawings and other documents to fix and describe <br /> the size and character of the Proiect as to architectural, struc- <br /> 1.1 ARCHITECT'S SERVICES rural, mechanical and electrical systems, materials and such <br /> 1.1.1 The Architect's services consist of those services per- other elements as may be appropriate. <br /> formed by the Architect, Architect's employees and Architect's 2.3.2 The Architect shall advise the Owner of any adjustments <br /> consultants as enumerated in Articles 2 and 3 of this Agreement <br /> and any other services included in Article 12. to the preliminary, estimate of Construction Cost. <br /> <br /> 1.1.2 The Architect's services shall be perfomled as expedi- 2.4 CONSTRUCTION DOCUMENTS PHASE <br /> tiously as is consistent with professional skill and care and the <br /> orderly progress of the Work. Upon request of the Owner. the 2.4.1 Based on the approved Design Development Docu- <br /> Architect shall submit for the Owner's approval a schedule for merits and any further adjustments in the scope or quality of <br /> the performance of the Architect's services which may be the Project or in the construction budget authorized by the <br /> adjusted as the Project proceeds. and shall include allowances Owner, the Architect shall prepare. for approval bv the Owner, <br /> for perlocks of time required for the Owner's review and for Construction Documents consisting of Drawings and Specifica- <br /> approval of submissions by authorities having jurisdiction over tions setting forth in detail the requirements for the construc- <br /> tion of the Project. <br /> the Project. Time timits established by this schedule approved <br />by the Owner shall not. except tbr reasonable caR. be exceeded 2.4.2 The Architect shall assist the Owner in the preparation of <br />by the Architect or Owner. the necessary bidding information, bidding forms, the Condi- <br />1.1.3 The services covered by this Agreement are subject to tions of the Contract, and the form of Agreement between the <br />the time limitations contained in Subparagraph 11.5.1. Owner and Contractor. <br /> 2.4.3 The Architect shall advise the Owner of:my adjustments <br /> ARTICLE 2 to previous preliminary. estimates of Construction Cost indi- <br /> cated by changes in requirements or general market conditions. <br /> SCOPE OF ARCHITECT'S BASIC SERVICES <br /> 2.4.4 The Architect shall assist the Owner in connection with <br />2.1 DEFINITION the Owner's responsibility for filing documents required for <br /> the approval of governmental authorities having jurisdiction <br />2.1.1 The Architect's Basic Services consist of those described over the Project. <br />in Paragraphs 2.2 through 2.6 and any other services identified <br />in Article 12 as pan of Basic Services, and include normal struc- 2.5 BIDDING OR NEGOTIATION PHASE <br />tural, mechanical and electrical engineering services. <br /> 2.$.1 The Architect. following the Owner's approval of the <br />2.2 SCHEMATIC DESIGN PHASE Construction Documents and of the latest preliminary, estimate <br />2.2.1 The Architect shall review the program furnished by the of Construction Cost, shall assist the Owner in obtaining bids <br />Owner to ascertain the requirements of the Proiect and shall or negotiated proposals and assist in awarding and prepanng <br />arrive at a mutual understanding of such requirements with the contracts for construction. <br />Owner. <br /> 2.6 CONSTRUCTION PHASE--ADMINISTRATION <br />2.2.2 The Architect shall provide a preliminary. evaluation of OF THE CONSTRUCTION CONTRACT <br />the Owner's program, schedule and construction budget <br />requirements, each in terms of the other, subject to the limita- 2.6.1 The Architect's responsibility to provide Basic Services <br />tions set forth in Subparagraph 5.2.1. for the Construction Phase under this Agreement commences <br /> with the award of the Contract for Construction and terminates <br />2.2.3 The Architect shall review with the Owner alternative at the earlier of the issuance to the Owner of the final Certificate <br />approaches to design and construction of the Project. for Payment or 60 days after the date of Substantial Completion <br />2.2.4 Based on the mutually agreed-upon program, schedule of the Work, unless extended under the terms of Subparagraph <br />and construction budget requirements. the Architect shall 10.3.3. <br />prepare, for approval by the Owner, Schematic Design Docu- 2.6.2 The Architect shall provide administration of the Con- <br />ments consisting of drawings and other documents illustrating tract for Construction as set forth below and in the edition of <br />the scale and relationship of Project components. AIA Document A201, General Conditions of the Contract for <br />2.2.$ The Architect shall submit to the Owner a preliminary. Construction, current as of the date of this Agreement, unless <br />estffnate of Construction Cost based on current area. volume or otherwise provided in this Agreement. <br />other unit costs. 2.6.3 Duties, responsibilities and limitations of authority of the <br />2.3 DI~IGN DEVELOPMENT PHASE Architect shall not be restfeted, modified or extended without <br /> written agreement of the Owner and Architect with consent of <br />2.3.1 Based on the approved Schematic Design Documents the Contractor, which consent shall not be unreasonably <br />and any adjustments authorized by the Owner in the program, withheld. <br /> <br />AIA DOeUMIgNT B141 , OWNER-ARCHITECT AGREEMENT · FOURTEENTH EDITION · AIA® · © 1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE. N.W., WASHINGTON, D.C. 20006 B141-1987 2 <br /> <br /> <br />