My WebLink
|
Help
|
About
|
Sign Out
CCMIN061891
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
1990-1999
>
1991
>
CCMIN061891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 10:55:13 AM
Creation date
10/29/1999 10:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
237 <br /> <br /> Mr. Elliott replied that the $45,000 represents Pleasanton's <br />estimated share for a public relations information program to be <br />implemented by the County. He indicated that all the costs, which <br />were prepared by a consultant hired by the County, are estimates. <br /> <br /> Mr. Mercer stated that the costs are a requirement of the <br />Regional Water Quality Control Board and that part of those costs <br />are associated with the requirements of 1986 Basin Plan, which is <br />a State law. <br /> <br /> Ms. Acosta clarified that the $200,000 for "soft cost" would <br />be absorbed by existing Staff and that Pleasanton's out-of-pocket <br />costs for the first year would be approximately $150,000. She <br />added that the City needs to participate in the program to get its <br />permit approved. <br /> <br /> It was moved by Ms. Mohr, and seconded by Ms. Scribner, that <br />the following actions be taken on the Consent Calendar, as amended: <br /> <br /> a. Approve the City Council Minutes for 6/4/91. <br /> <br /> b. Proclaim October 19-27, 1991 as "Red Ribbon Week." <br /> <br /> c. Review of bids and award of contract for Project <br /> No. 905065, the addition of an acceleration lane in the <br /> median island on Santa Rita Road at Sutter Gate Avenue to <br /> AMBO Engineering, Inc., of Union City, for a low bid of <br /> $44,936.00, authorize the transfer of surplus funds in <br /> the amount of $21,000 from CIP No. 875032, the Traffic <br /> Signal Interconnect Project account, and approve the <br /> contracts with Earth Systems Consultants of Pleasanton, <br /> for soil testing services, and Associated Consultants <br /> Group, Inc, of Dublin, for surveying services for the <br /> project. (SR 91:225) <br /> <br /> d. Accept the Water Conservation Progress Report for <br /> May 1991. (IR 9:37) <br /> <br /> e. Review of bids and award of contract for legal <br /> publications for Fiscal Year 1991-92 to Tri-Valley <br /> Herald. (SR 91:226) <br /> <br /> f. Adopt Resolution No. 91-94, approving the Agreement <br /> between the Alameda County Flood Control and Water <br /> Conservation District, Zone 7 of the ACFC&WCD, Alameda <br /> County, and the 14 Cities in Alameda County to implement <br /> the Alameda County Runoff Clean Water Program, and <br /> directing Staff to investigate and plan for the <br /> <br /> - 2 - <br /> 6-18-91 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.