Laserfiche WebLink
156 <br /> <br /> 1. Accept the public improvements for Project No. 887060, <br /> McKinley Park, a four-acre neighborhood park located on <br /> the south side of Kottinger Drive, west of Cabernet <br /> Court, authorize the filing of the Notice of Completion <br /> and the release of the ten percent (10%) retention in the <br /> amount of $9,368.34, thirty (30) days after the filing of <br /> the Notice of Completion, to Collishaw Construction, Inc. <br /> (SR 91:165) <br /> <br /> m. Accept the public improvements for Project No. 875059, <br /> the construction of an eight-foot high soundwall along <br /> the east side of Foothill Road from the southerly <br /> boundary of Moller Park to Muirwood Drive South, <br /> authorize the filing of the Notice of Completion, final <br /> payment in the amount of $630.00 and the release of the <br /> ten percent (10%) retention in the amount of $43,559.47, <br /> thirty (30) days after the filing of the Notice of <br /> Completion,to B & B Concrete Construction, Inc. <br /> (SR 91:170) <br /> <br /> n. Adopt Resolution No. 91-65, establishing the boundary of <br /> Underground District 91-1, allowing for the removal of <br /> the utility poles and overhead lines along the front and <br /> rear of the proposed Senior Center. (SR 91:167) <br /> <br /> o. Review of bids and award of contract for Project <br /> No. 887058, the environmental cleanup of the site for the <br /> proposed Senior Center on Sunol Boulevard, consisting of <br /> the removal of five underground fuel tanks and pumping <br /> station, two buried transformers, and soils contaminated <br /> with pesticides and paint residues, to Exceltech, Inc., <br /> of Fremont, for the base bid plus Alternate 1 of <br /> $88,225.00, and authorization to advance funds from the <br /> General Fund in the amount of $150,000.00 for this <br /> portion of the Senior Center. (SR 91:162) <br /> <br /> p. Adopt of Resolution No. 91-66, approving the Agreement <br /> with Berlogar Geotechnical Consultants for soils <br /> engineering services during the environmental cleanup and <br /> construction of the proposed Senior Center, and <br /> authorizing the advance of funds from the General Fund <br /> for the cost of the consultant services. (SR 91:177) <br /> <br /> q. Approval of theAmendment to the contract with CH2M Hill, <br /> Inc. for construction management services for the <br /> Operations Service Center, and authorization of the <br /> expenditure of $11,000.00 from the Operations Service <br /> Center funds to cover the costs of the Amendment. <br /> (SR 91:175) <br /> <br /> - 4 - <br /> 5-7-91 <br /> <br /> <br />