My WebLink
|
Help
|
About
|
Sign Out
CCMIN030392
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
1990-1999
>
1992
>
CCMIN030392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 10:55:03 AM
Creation date
10/29/1999 10:04:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
110 <br /> <br /> Ms. Mohr asked if there would be any expectation that other <br /> sports groups would ask for a snack bar. She also asked if the <br /> Pleasanton Upper Field would need a snack bar. <br /> <br /> Ms. Bengtson stated that this proposed snack bar would be the <br /> last one to be added to the park. The Pleasanton Upper Field would <br /> not be a profitable location to place a snack bar. <br /> <br /> Ms. Mohr asked if it would relieve some of the competition <br /> between the sports groups if the City operated the snack bars. <br /> <br /> Ms. Bengtson replied the problem with having the City operate <br /> the snack bars would be that it would not be able to return all the <br /> dollars to the sports groups. The current operation is a very low <br /> cost operation due to volunteer work, which would not be available <br /> to the City. <br /> <br /> Mr. Butler was concerned with investing $55,000 to build a <br /> permanent snack bar. He would rather this money be used for other <br /> uses such as lights. He suggested placing a temporary snack bar <br /> facility to be used on a long term basis. He would support a <br /> motion to approve this item with the assumption that Option <br /> could still be investigated because it is far enough in the future. <br /> <br /> Ms. Bengtson said the total project cost would be $100,000. <br /> The major problem, the irrigation and drainage of the Pleasanton <br /> Upper Field and the parking lot, would have to be addressed before <br /> the lighting could be improved. <br /> <br /> Mr. Tarver commented that he would like the lighting issues <br /> addressed as soon as possible. He felt the high schools would be <br /> the best location to consider. <br /> <br /> It was moved by Ms. Mohr, and seconded by Mr. Tarver, to <br /> introduce the following projects on the park Capital Improvement <br /> Plan: <br /> <br /> A) Three fully developed softball fields to be located on the <br /> southeast side of Sports Park (canal side) in the general area <br /> of existing grass fields No. 1, No. 2, and unused soccer field <br /> No. 2, to be funded in FY 92/93; <br /> <br /> (B) The lease or rental of a portable snack bar facility for <br /> the existing PGSL area utilizing the funds contributed by PGSL <br /> for a permanent snack bar, supplemented by the City if <br /> required, available in time for the 1993 season; the <br /> construction of a permanent snack bar, at cost effective <br /> design (maximum cost $55,000), to be funded in the FY 94/95 <br /> Park Capital Improvement Budget or before if funds are <br /> available; <br /> <br /> 3/3/92 <br /> 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.