Laserfiche WebLink
EXHIBIT A <br /> <br />MUBISSELL & <br /> KARN, INC. <br /> 4637 Chabot Dr., Suite 204 <br /> Pleasanton, CA 94566 <br /> (415) 463-0660 <br /> <br />January 28, 1988 Job #000002.00 <br /> <br />Mr. Dave Bolin <br />City of Pleasanton <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Subject: Proposal for Design of Water System Improvements for Implementation <br /> of the Foothill Pressure Zone <br /> <br />Dear Mr. Bolin: <br /> <br />AS you requested, we are subm/tting this proposal for design of the <br />remaining improvements to the City Water System that will be necessary to <br />completely implement the Foothill Pressure Zone. This work will supplement <br />the work we are now doing and have already completed in planning and <br />implementation of the Foothill Pressure Zone. <br /> <br />To review the status of the project at this time, the tasks included in our <br />current contract and their present status are as follows: <br /> <br /> 1. Planning and design of check valve installations to separate the <br /> Foothill and Lower Zones while allowing flow from the Lower Zone <br /> into the Foothill Zone in the event of fire or other low pressure <br /> emergency. <br /> <br /> This work is essentially complete. Preliminary plans were reviewed <br /> with City staff in November or December. We received comments from <br /> Dave van Houten early this week. The plan is now being finalized <br /> and should be ready for final review nextweek. <br /> <br /> 2. Investigation, planning and design of new and/or modified booster <br /> pumps to serve individual customers in the area to be converted to <br /> the Lower Zone. This included review of impacts on fire protection <br /> capacity. <br /> <br /> The system has been evaluated and we have made a preliminary <br /> determination of what the impacts will be. Those results have been <br /> submitted to the City for a review of our proposed service <br /> criteria. We are awaiting a decision from the City -to the <br /> minimum allowable pressure. ~c~ ' ' ' /" <br /> additional testing will need to o <br /> ments designed as necessary. <br /> <br /> JAN 2 9 1988 <br /> <br /> <br />