Laserfiche WebLink
CROSS-TOWN SANITARY SEWER INTERCEPTOR <br /> <br /> PRELIMINARY DESIGN REPORT COST BREAKEOWN <br /> <br /> Task Professional Other Staff Subconsultant Other Task Total <br /> Description. Hrs. Dollars Hrs. Dollars Dollars Dollars Dollars <br /> <br />1.1 Review Pre-Design 62 3400 8 300 -- -- 3700 <br /> <br />1.2 Feasibility of <br />Elimination of <br />PS4 28 1500 -- -- 600 -- 2100 <br /> <br />1.3 Flow Monitoring 23 900 82 1900 -- 2900 5700 <br /> ( opt ional ) <br /> <br />1.4 Determine <br /> Required Capacity <br /> of Interceptor 72 4400 20 900 -- -- 5300 <br /> <br />1.5 Aligrment <br />Selection 132 8000 20 900 2000 -- 10900 <br /> <br />1.6 Preparation <br />Prel im inary <br />Design Report 104 7200 64 2500 -- 1000 10700 <br /> <br />1.7 Project Mgnt. 44 3800 8 300 '7... -- 4100 <br /> Total 465 29,200 202 6800 2600 3900 42,500 <br /> <br /> <br />