Laserfiche WebLink
COST ESTIMATE <br /> <br />A. Street Improvements $ 735,100 <br /> <br /> 1. Clearing and grubbing, grading, <br /> pavement, base, street signing and <br /> marking, erosion control and survey <br /> monuments $500,500 <br /> <br /> 2. Curb and gutter, median curbing, <br /> driveway approaches storm drain <br /> outfall & curb drain inlets 138,600 <br /> <br /> 3. Street light system 96,000 <br />B. Utility Improvements $1,463,090 <br /> <br /> 1. Storm drain system $405,700 <br /> 2. Sanitary sewer system 204,800 <br /> 3. Water system and hydrants 346,800 <br /> 4. Subdrain systemq 50,000 <br /> <br /> 5. Trenching and backfill for power, gas, <br /> and telephone conduits and structures, <br /> and installation of facilities 455,790 <br /> <br />C. Public Area Landscapinq $1,678,500 <br /> <br /> 1. Landscaping and irrigation at roadway <br /> sidings and median areas including <br /> sidewalks and entry walls $933,800 <br /> <br /> 2. Landscaping and irrigation at Arroyo area <br /> including roadways, walways, parcourse <br /> furniture and drainage system 361,000 <br /> <br /> 3. Landscaping and irrigation at west <br /> perimeter area including pathways and <br /> monument sign 235,200 <br /> <br /> 4. Landscaping and irrigation within <br /> Caltrans right-of-way 148,500 <br /> <br />D. Arroyo Improvements $ 231,500 <br /> 1. Bank Stabilization $182,600 <br /> 2. Revegetation 48,900 <br />3 <br /> <br /> <br />