Laserfiche WebLink
& gutter; sidewalks; driveways; landscaping; <br /> irrigation; street signs; pavement marking; a street <br /> light system with appurtenances; a domestic water <br /> system with appurtenances including fire hydrants and <br /> services; a storm drainage system and appurtenances; a <br /> sanitary sewer system and appurtenances; and an <br /> erosion control system. <br /> <br />B. The construction of a new street called Koll Center <br /> Drive beginning at Bernal Avenue at a point <br /> approximately 700' west of freeway 680 and extending <br /> approximately 300' northerly to Koll Center Parkway by <br /> means of clearing; grubbing; demolition; grading; <br /> ditching and the installation of pavement; baserock; <br /> medians; curb & gutter; sidewalks; landscaping <br /> including decorative entry walls; irrigation; street <br /> signs; pavement marking; a street light system with <br /> appurtenances; a domestic water system with <br /> appurtenances including fire hydrants and services; a <br /> storm drainage system and appurtenances; a sanitary <br /> sewer system and appurtenances; and an erosion control <br /> system. <br /> <br />C. The improvement of the south side of the Arroyo del <br /> Valle from Valley Avenue to freeway 680 by means of <br /> clearing; grubbing; grading; bank stabilization; and <br /> the installation of landscaping; irrigation; walkways; <br /> accessways; "street furniture"; and a storm drainage <br /> system and appurtenances. <br /> <br />D. The improvement of an area along the east side of the <br /> freeway 680 right-of-way and within the freeway 680 <br /> right-of-way from Bernal Avenue to the Arroyo del <br /> Valle by means of clearing; grubbing; grading; and the <br /> installation of landscaping; irrigation, a project <br /> identification sign; and walkways. <br /> <br />E. The installation of a system to convey gas and <br /> electricity and for telephone service together with <br /> their appurtenances within Public Utility Easements <br /> adjacent to Koll Center Parkway and Koll Center Drive. <br /> <br />F. The construction of a sanitary sewer system and its <br /> appurtenances extending from Koll Center Parkway <br /> approximately 600' west to existing sanitary systems <br /> along freeway 680 in two locations. <br /> <br />G. The construction of a subdrain system and its <br /> appurtenances extending from Koll Center Parkway <br /> approximately 600' west in 2 locations and thence <br /> northerly along freeway 680 approximately 2400' north <br /> to the Arroyo del Valle. <br /> <br /> 2 <br /> <br /> <br />