Laserfiche WebLink
SCHEDULE OF TASK COSTS <br /> <br /> The following table summarizes the estimated fee for the <br /> tasks. <br /> Estimated <br /> Task Fee <br />1 Noise Section Revision $ 1,487 <br />2 Hazardous Waste 1,530 <br />3 Cultural Resources Supplemental <br /> Investigation 706 <br />4 Complete Right-of-Way Data Sheet 496 <br />5 Incorporate Caltrans PSR Text into ED 1,639 <br />6 TJKM Supplemental Traffic Analysis 10,500 <br />7 Incorporate Supplemental Traffic 2,378 <br /> Analysis into ED <br />8 Air Quality Anaysis to Reflect Traffic <br /> Revisions 398 <br />9 Section 5, Traffic Section, Reformating 7,715 <br />10 Respond to Miscellaneous Caltrans <br /> Review Comments 7,779 <br />11 Respond to Caltrans Final Comments 6,478 <br />12 Prepare and Distribute Final Draft <br /> Environmental Document 8,919 <br />13 Attend Map Display and Public Hearing 2,000 <br />14 Assemble and Distribute Revised Final Draft ED 7,452 <br />15 Assemble and Distribute Final ED 6,523 <br /> Estimate Total Fee $66F000 <br /> <br /> Contingency $2,500 <br /> <br /> Not to Exceed Limit $68,500 <br /> <br />SFR83/063 <br /> <br /> <br />