My WebLink
|
Help
|
About
|
Sign Out
RES 88434
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2012 3:45:52 PM
Creation date
12/1/1999 11:33:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/6/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29. That the property owner enter into an agreement with the City <br /> whereby he agrees to construct or finance the construction of <br /> street improvements adjacent to the site to the extent <br /> required by the Subdivision Ordinance at such time in the <br /> future as this is deemed necessary by the City Engineer. <br /> Said improvements may include, but are .not necessarily <br /> limited to grading, curb and gutter, sidewalk, paving, street <br /> lighting, street trees, street monuments, underground <br /> utilities, storm drain facilities, sanitary sewer facilities, <br /> tree removal, traffic control devices, landscaping and <br /> automatic irrigation systems. This agreement shall be <br /> executed and approved by the City Council prior to the <br /> issuance of a building permit. The property owner/developer <br /> shall deposit a bond with the City to ensure future <br /> completion of the required improvements. This bond shall be <br /> in a standard form approved by the City Attorney and shall be <br /> in an amount satisfactory to the City Engineer. The City <br /> Engineer may accept or may require a cash payment in-lieu of <br /> bonding where circumstances warrant. <br /> <br />30. That the developer submit a refundable cash bond for hazard <br /> and erosion control prior to issuance of a building permit. <br /> The amount of this bond will be determined by the City <br /> Engineer. <br /> <br />31. That a sanitary sewer sampling manhole be provided on the <br /> sanitary sewer lateral from each building, unless otherwise <br /> waived by the City Engineer. <br /> <br />32. That prior to issuance of a building permit, the developer <br /> shall pay the applicable Zone 7 and City connection fees and <br /> water meter cost for any water meters (irrigation meters) not <br /> directly related to a building permit. <br /> <br />33. That the developer dedicate to the City for a street <br /> right-of-way purposes those parcels of land intended to be <br /> public streets. <br /> <br />34. That the developer grant an easement to the City over those <br /> parcels shown as public service easements (P.S.E.) and which <br /> are approved by the City Engineer or other parcels which may <br /> be designated by the City Engineer. <br /> <br />35. That approval of the design for the line, grade, and <br /> structural sections for the streets serving this development <br /> be withheld pending final engineering design and review by <br /> the City Engineer. <br /> <br />36. That vertical P.C.C. curbs and gutters be constructed within <br /> this development unless otherwise approved by the City <br /> Engineer and that the curb and gutter be poured <br /> monolithically with the sidewalk when the sidewalk is <br /> adjacent. <br /> <br />Rev. 2/S4 10/S4 5/S6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.