Laserfiche WebLink
EXHIBIT A <br /> <br /> CANYON MEADOWS OFF-SITE IMPROVEMENTS <br /> (DUBLIN CANYON ROAD INTERIM ALIGNMENT) <br /> PRELIMINARY ESTIMATE <br /> <br />Description 92A~DjLi~ Unit Unit Price AmOunt <br /> <br />Earthwork 7,000 C.Y. $ 5.00 $ 35,000.00 <br />A.C. Pavement 77,718 S.F. 2.70 209,839.00 <br />(.3'/.55'/.95') <br />A.C. Dike 6,447 L.F. 4.00 25,788.00 <br />Median Curb 2,094 L.F. 8.00 16,752.00 <br />Caltrans Type 2 342 L.F. 100.00 34,200.00 <br />Retaining Wall <br />Box Culvert Extensions L.S. 75,000.00 <br />Extend Exist. 18" S.D. L.S. 10,000.00 <br />and place RIP RAP <br />Alameda Co. Type I 4 EA. 1,250.00 5,000.00 <br />Catch Basin <br />Driveway Reconstruction 9 EA. 1,500.00(AVE) 13,500.00 <br />10" PVC Sanitary Sewer 3,512 L.F. 49.00 172,088.00 <br />10" ABS Sanitary Sewer 380 L.F. 51.00 19,380.00 <br />10" D.I. Sanitary Sewer 477 L.F. 54.00 25,758.00 <br />Manholes 12 EA. 2,500.00 30,000.00 <br />12" Water 4,442 L.F. 45.00 199,890.00 <br />Fire Hydrants 8 EA. 2,500.00 20,000.00 <br />Striping L.S. 10,000.00 <br />Signing L.S. 2,000.00 <br />Relocate Joint Poles 12 EA. 3,000.00 36,000.00 <br />Monuments 8 EA. 300.00 2,400.00 <br />Street Lights 15 EA. 2,500.00 37,500.00 <br />Right-of-Way Acquisition <br />1. Legal Fees 15,000.00 <br />2. Land Cost 124,000.00 <br /> (0.62 ac. @ $200,000/ac.) <br /> <br />SUBTOTAL $1,119,095.00 <br />Contingency @ 7% 78,337.00 <br />TOTAL (Excluding Interim Pump Station) $1,197,432.00 <br /> <br /> 8 Page 1 of 2 <br /> <br /> <br />