My WebLink
|
Help
|
About
|
Sign Out
RES 88389
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2012 3:11:15 PM
Creation date
12/1/1999 11:07:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/16/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />NIELSON PARK <br />SCOPE OF SERVICES <br /> <br />Phase I: Analysis and Evaluation <br /> <br /> A. Conduct site visit to analyze existing <br /> conditions, adjacent land use, circulation and <br /> access patterns, landform, climatic factors, <br /> vegetation and views in and out of site. <br /> <br /> B. Collect and review available data and existing <br /> plan information to ascertain design <br /> implications. <br /> <br /> C. Identify existing utility service system: <br /> water, gas and electrical supply, sanitary <br /> sewer and storm drainage. <br /> <br /> D. Attend meeting with City staff to review and <br /> evaluate the existing Master Plan, receive <br /> input frm the playground committee and park <br /> maintenance department, project objectives, and <br /> to establish design criteria and schedule. <br /> <br />Phase II: Design Development <br /> <br /> A. Refine and develop the park design in <br /> preparation for production of construction <br /> documents in regard to the following: <br /> <br /> 1. Product and materials research; <br /> 2. Grading and drainage; <br /> 3. Planting concept and palette; <br /> 4. Organization and layout of construction; <br /> 5. Specifications outline; <br /> 6. Preliminary cost estimate. <br /> <br /> B. Meet with City staff to review design <br /> development package. <br /> <br /> C. Prepare construction document base sheet (1) at <br /> 1" = 30'scale. <br /> <br /> D. Submit base sheet to City staff for review and <br /> approval to proceed. <br /> <br />PHASE III. Construction Documents <br /> <br /> A. Prepare plans, details and specifications <br /> necessary for construction of the park, <br /> including the following: <br /> <br /> 1. Cover sheet; <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.