My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
091807
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2007 12:20:11 PM
Creation date
9/14/2007 12:20:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
High Speed Rail over Pacheco -With high speed rail over Pacheco, there would be no <br />High Speed Rail through the Altamont and the Regional Rail Plan would use the <br />recommendations already outlined. This alignment does not create impact to <br />Pleasanton. <br />High Speed Rail over Altamont and Pacheco -This alternative would operate <br />predominantly upgraded regional service through the Altamont and predominantly <br />Southern California express trains through Pacheco. Accordingly, only 2 tracks would <br />be required, including at stations. This option also allows for deferring high cost and <br />environmentally challenging segments of the Altamont such as provision of a two-track <br />high bridge across Dumbarton and a tunnel under Niles Canyon (in the event <br />passenger-only tracks are developed along the SPRR right-of--way). Staff has the same <br />concerns with this high speed alignment as noted under the High Speed Rail over <br />Altamont section above. <br />Submitted by: <br />~~~ <br />Rob Wilson <br />Public Works Director <br />Attachments: <br />1. Tri-Valley Policy Advisory Committee Letter <br />Approved by: <br />Nelson Fialho <br />City Manager <br />Page5of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.