My WebLink
|
Help
|
About
|
Sign Out
17 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
090407
>
17 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2007 5:17:02 PM
Creation date
8/30/2007 5:16:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
17 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Implement Oak Grove Planned Unit Development (PUD-33) Mitigation Measure <br />D4. <br />c. Findings. <br />Based on the EIR and the entire record before the City, the City finds that: <br />Effects of Mitigation. <br />• The Environmentally Superior Project's potential impacts related to the loss of <br />raptors and their habitat will be mitigated to less than significant levels through, <br />as conditioned, executing apre-construction survey 30 days prior to beginning <br />site grading to verify the presence or absence of active raptor nests. <br />Construction shall not take place if it is determined that such construction would <br />disturb an identified active raptor nest. <br />This condition shall cover the development and/or the individual building sites. <br />ii) Remaining Impacts. <br />Any remaining impacts related to impacts to burrowing owl habitat will be less than <br />significant. <br />5. Loss of Burrowing Owl and Its Habitat (DEIR, pp. 107, 116-117 and 359/360; <br />Condition 10 of PUD-33; MMIP D5). <br />a. Potentiallmpact. <br />The Original Project's potential impacts on burrowing owl due to disturbance of potential <br />burrowing owl nesting and habitat sites are discussed in the DEIR at page 107 and the <br />Environmentally Superior Project's impacts are discussed at page 360. <br />b. Mitigation Measures. <br />The following mitigation measure is hereby adopted and will be implemented as <br />provided for in the Mitigation Monitoring and Implementation Program: <br />• Implement Oak Grove Planned Unit Development (PUD-33) Mitigation Measure <br />D5. <br />c. Findings. <br />Based on the EIR and the entire record before the City, the City finds that: <br />Page 18 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.