My WebLink
|
Help
|
About
|
Sign Out
PC-2007-22, PUD-93-02-09M, BARNABAS NAGY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-22, PUD-93-02-09M, BARNABAS NAGY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:44 AM
Creation date
8/30/2007 1:41:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/9/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
development plan shall include all required information to design and construct <br />site, grading, paving, drainage, and utilities. Specific items to be indicated on the <br />site development plan necessary to construct the improvements are to be in <br />accordance with the City of Pleasanton Private Development Design Guidelines <br />adopted April 15, 1986. <br /> <br />40. A sanitary sewer-sampling manhole shall be provided on each of the sanitary <br />sewer lateral from each building, unless otherwise waived by the Chief Building <br />Official. <br /> <br />41. The project developer shall submit two copies of the site soils report to the Chief <br />Building Official at the time plans are submitted for the first building plan check <br />review. When deemed necessary by the Chief Building Official, a third party peer <br />review of the soil report shall be completed. The City will select all third party <br />peer reviewers. All third party peer reviews shall be paid for by the project <br />developer at the time specified by the Chief Building Official. <br /> <br />42. The soils engineer shall certify the pad compactions of all lots containing fill to <br />the satisfaction of the Chief Building Official prior to the issuance of building <br />permits. <br /> <br />Construction Requirements: <br /> <br />43. All construction activities shall be limited to the hours of 8:00 a.m. to 5:00 p.m., <br />Monday through Friday. In addition, no construction shall be allowed on Federal <br />Holidays. The Planning Director may allow earlier “start-times” for specific <br />construction activities (e.g., concrete-foundation/floor pouring), if it can be <br />demonstrated to the satisfaction of the Planning Director that the construction <br />and construction traffic noise will not affect nearby residents. All construction <br />equipment must meet Department of Motor Vehicles (DMV) noise standards and <br />shall be equipped with muffling devices. <br /> <br />44. At no time shall campers, trailers, motor homes, or any other vehicle be used as <br />living or sleeping quarters on the construction site. All such vehicles shall be <br />removed from the site at the end of each workday. <br /> <br />45. A temporary construction trailer shall be allowed on site during construction for <br />use during the allowed hours of operation. <br /> <br />46. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />47. If archeological materials are uncovered during grading, trenching, or other on- <br />site excavation, all work on site shall be stopped and the City immediately <br />notified. The county coroner and the Native American Heritage Commission <br />shall also be notified and procedures followed as required by the California <br /> 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.