My WebLink
|
Help
|
About
|
Sign Out
PC-2007-22, PUD-93-02-09M, BARNABAS NAGY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-22, PUD-93-02-09M, BARNABAS NAGY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:44 AM
Creation date
8/30/2007 1:41:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/9/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
minimum allowed by the Police Department. The applicant shall submit a <br />photometric plan which shall include the following: <br />? <br /> Photometric calculations detailing all exterior security lighting, <br />? <br /> Foot-candle calculations, <br />? <br /> Fixture schedule, and <br />? <br /> Cut sheets for light fixtures identifying the specific luminary and lamp <br />manufacturer. <br /> <br />6. The PUD development plan modification and conditional use permit approvals <br />will lapse and shall be void within two years following the effective date of the <br />City Council approval, unless a building permit is issued and construction has <br />commenced and is diligently pursued toward completion or an extension has <br />been approved by the City. <br /> <br />7. This approval does not guarantee the availability of sufficient water to serve the <br />project. The City shall withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is in effect, unless the <br />City has adopted a water offset program and unless the project developer is <br />participating in the program. Notwithstanding the project developer's <br />participation in such a program, the City may withhold building permits if the City <br />determines that sufficient water is not available at the time of application of <br />building permits. <br /> <br />8. Prior to issuance of a building permit, the project developer shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water <br />meters, including irrigation meters. Additionally, the project developer shall pay <br />any applicable Dublin San Ramon Services District (DSRSD) sewer permit fee. <br /> <br />9. The building permit plan check materials will be accepted for submittal only after <br />completion of the 15-day appeal period, measured from the date of the approval <br />letter, unless the project developer submits a signed statement acknowledging <br />that the plan check fees may be forfeited in the event that the approval is <br />overturned on appeal, or that the design is significantly changed as a result of the <br />appeal. In no case will a building permit be issued prior to the expiration of the <br />15-day time-period. <br /> <br />Planning Requirements: <br /> <br />10. All conditions of approval for this approval shall be written by the project <br />developer on all building permit plan check sets submitted for review and <br />approval or attached and become a part of this plan set. These conditions of <br />approval shall be on, at all times, all construction plans kept on the project site. It <br />is the responsibility of the building developer to ensure that the project contractor <br />is aware of, and abides by, all conditions of approval. Prior approval from the <br />Planning Department must be received before any changes are constituted in <br />site design, building design, etc. <br /> 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.