My WebLink
|
Help
|
About
|
Sign Out
PC-2007-22, PUD-93-02-09M, BARNABAS NAGY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-22, PUD-93-02-09M, BARNABAS NAGY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:44 AM
Creation date
8/30/2007 1:41:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/9/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
56. A permit issued by the Fire Chief is required prior to any installation of a fire <br />detection, alarm, and occupant notification system. All sprinkler system water <br />flow and control valves shall be complete and serviceable prior to final <br />inspection. Prior to the occupancy of a building having a fire alarm system, the <br />Fire Department shall test and witness the operation of the fire alarm system. <br /> <br />57. All portions of the building covered by this approval shall have installed and <br />operating, fire extinguishers with a minimum 2-A:10-B:C rating. The fire <br />extinguishers shall be located within a 75-foot radius of each other. <br /> <br />58. The applicant shall submit the design of the EVA gate to the Fire Marshall for <br />review and approval prior to the issuance of a building permit. <br /> <br />59. The applicant shall show turning radius details on the parking lot circulation plan <br />for the review and approval by the Fire Marshal. The driveway shall be designed <br />to hold the load of loaded fire truck, and is subject to the review and approval by <br />the Fire Marshal prior to the issuance of a building permit. <br /> <br />60. The applicant shall provide a fire hydrant for the proposed development. The <br />details of the fire hydrant shall be submitted to the Fire Marshal for review and <br />approval prior to occupancy. <br /> <br />Engineering Requirements: <br /> <br />61. The applicant shall submit a detailed sewer design for the review and approval <br />by the City Engineer prior to issuance of a building permit. <br /> <br />62. All utilities required to serve the proposed development on-site shall be installed <br />underground. <br /> <br />63. The project developer shall submit a refundable cash bond for hazard and <br />erosion control prior to issuance of an Engineering or Building and Safety <br />Division permit. The amount of this bond will be determined by the City <br />Engineer. <br /> <br />64. The haul route for all materials to and from this development shall be approved <br />by the City Engineer prior to the issuance of an encroachment permit. <br /> <br />65. The project developer shall submit a dust control plan or procedure as part of the <br />building permit plans. <br /> <br />66. Storm drainage swales shall be privately maintained by the property owner. <br /> <br />67. The design of the water supply systems shall be subject to the review and <br />approval of the City Engineer. <br /> <br /> 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.