My WebLink
|
Help
|
About
|
Sign Out
PC-2007-35, PUD-55,CAREY-MAESTAS
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-35, PUD-55,CAREY-MAESTAS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
8/30/2007 1:29:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/11/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1) Electrical conduit and cable pull strings shall be installed from the roof/attic <br />area to the buildings’ main electrical panels. <br />2) Roof trusses shall be engineered to handle an addition load of five (5) <br />pounds per square foot beyond that of the anticipated load for the roofing <br />material. <br />3) An area shall be provided near the electrical panel for the installation of an <br />“inverter” required to convert the direct current output from the photovoltaic <br />panels to alternating current. <br /> <br />These measures shall be shown on the building permit plan set submitted to <br />the Planning Director for review and approval before issuance of the first <br />building permit. The project developer shall provide the future homeowners the <br />necessary information delineating the means by which photovoltaic panels can <br />be applied to the roofs of the structures covered by this approval. This <br />information shall be submitted tot the Planning Director for review and approval <br />prior to the occupancy of the first unit. <br /> <br />21. The electrical plan for this home shall provide telecommunications infrastructure <br />consistent with state-of-the-art methods, e.g., cabling for DSL, broadband, or <br />wireless service, wiring for total room access, etc., in effect at the time that <br />building permit(s) are issued. The plan shall be part of the building permits <br />issued for plumbing and electrical <br /> <br />Disclosure /Clause Conditions <br /> <br />22. Prior to recordation of the parcel map, a deed restriction shall be recorded on all <br />lots covered by this approval and shall include the following: <br />a. A clause which states that the property is in an area subject to noise, <br />activity and traffic impacts associated with a Downtown location. <br />b. A deed restriction prohibiting any new additions or accessory structures of <br />any type on the property. <br />c. Parking is prohibited at all times within the joint-access driveway. Moving, <br />delivery, and any other type of service vehicle must either park within the <br />home’s garage or designated parking spot, or park off-site. <br /> <br />23. Wording for all disclosures, deed restrictions, and clauses shall be submitted to <br />the City Attorney for review and approval before City Council approval of the first <br />final subdivision map for this development and shall be recorded over the project <br />site by separate instrument. <br /> <br />Landscaping Conditions <br /> <br />24. All recommendations and mitigation measures listed in the tree assessment <br />provided by HortScience on file with the Planning Department and dated, October <br />20, 2006 shall be implemented. The survey is approved Exhibit C. <br /> 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.