Laserfiche WebLink
construction of the 725 Main Street building, subject to the satisfaction of the <br />Planning Director. The cost of the roof inspections shall be borne by the <br />applicant. <br /> <br />49. At no time shall the delivery of construction material, parking of construction <br />vehicles, or storage of construction material impede the flow of traffic on Main <br />Street unless temporary and approved by the City Engineer. <br /> <br />50. A construction trailer shall be allowed to be placed on the project site for daily <br />administration/coordination purposes during the construction period. At no time <br />shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed <br />from the site at the end of each workday. <br /> <br />51. Portable toilets used during construction shall be emptied on a regular basis as <br />necessary to prevent odor. <br /> <br />52. Dust and mud shall be contained within the boundaries of the property during <br />times of construction. The project developer shall submit a dust control plan or <br />procedure as part of the building permit plans. <br /> <br />53. The project developer shall submit a waste generation disposal and diversion <br />plan to the Building and Safety Division prior to issuance of building or demolition <br />permits. The plan shall include the estimated composition and quantities of <br />waste to be generated and how the project developer shall recycle at least fifty <br />percent (50%) of the job site construction and demolition waste. Proof of <br />compliance shall be provided to the Chief Building Official prior to the issuance of <br />final occupancy. During demolition and construction, the project developer shall <br />mark all trash disposal bins "trash materials only" and all recycling bins "recycling <br />materials only". The project developer shall contact Pleasanton Garbage Service <br />for all waste disposal. Only that portion of trash and recycling waste refused by <br />Pleasanton Garbage Service shall be disposed of or diverted by another <br />trash/recycling company. <br /> <br />54. The applicant shall submit a pad elevation certification prepared by a licensed <br />land surveyor or registered civil engineer to the Chief Building Official and <br />Planning Director, certifying that the pad elevations and building location <br />(setbacks) are pursuant to the approved plans, prior to receiving a foundation <br />inspection for the structure. <br /> <br />55. The height of the building shall be surveyed and verified as being in conformance <br />to the approved building height as shown on the approved building permit plans. <br />Said verification is the project developer's responsibility, shall be performed by a <br />licensed land surveyor or civil engineer, and shall be completed and provided to <br />the Planning Department before the first framing or structural inspection by the <br />Building and Safety Division. <br /> 10 <br /> <br />