My WebLink
|
Help
|
About
|
Sign Out
PC-2007-27, PDR-599, CHONG KIM
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-27, PDR-599, CHONG KIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:44 AM
Creation date
8/30/2007 1:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/23/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Prior to issuance of a building permit, the project developer shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water <br />meters, including irrigation meters. Additionally, the project developer shall pay <br />any applicable Dublin San Ramon Services District (DSRSD) sewer permit fee. <br /> <br />6. The developer shall pay the in-lieu park dedication fees in effect at the time <br />building permits are issued for the structures to be constructed. <br /> <br />7. The project developer acknowledges that the City of Pleasanton does not <br />guarantee the availability of sufficient sewer capacity to serve this development <br />by the approval of this case, and that the project developer agrees and <br />acknowledges that building permit approval may be withheld if sewer capacity is <br />found by the City not to be available. <br /> <br />8. This approval does not guarantee the availability of sufficient water to serve the <br />project. The City shall withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is in effect, unless the <br />City has adopted a water offset program and unless the project developer is <br />participating in the program. Notwithstanding the project developer's <br />participation in such a program, the City may withhold building permits if the City <br />determines that sufficient water is not available at the time of application of <br />building permits. <br /> <br />9. The project developer shall submit a waste generation disposal and diversion <br />plan to the Building and Safety Division prior to issuance of building or demolition <br />permits. The plan shall include the estimated composition and quantities of <br />waste to be generated and how the project developer shall recycle at least fifty <br />percent (50%) of the job site construction and demolition waste. Proof of <br />compliance shall be provided to the Chief Building Official prior to the issuance of <br />final occupancy. During demolition and construction, the project developer shall <br />mark all trash disposal bins "trash materials only" and all recycling bins "recycling <br />materials only". The project developer shall contact Pleasanton Garbage Service <br />for all waste disposal. Only that portion of trash and recycling waste refused by <br />Pleasanton Garbage Service shall be disposed of or diverted by another <br />trash/recycling company. <br /> <br />10. The height of the structures shall be surveyed and verified as being in <br />conformance to the approved building height as shown on Exhibit A or as <br />otherwise conditioned. Said verification is the project developer's responsibility, <br />shall be performed by a licensed land surveyor or civil engineer, and shall be <br />completed and provided to the Planning Department before the first framing or <br />structural inspection by the Building and Safety Division. <br /> <br /> 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.