Laserfiche WebLink
11. The following changes shall be shown on the tentative subdivision map and/or <br />grading plan to the satisfaction of the City Engineer and shall be subject to <br />review/approval by the Planning Commission: <br /> <br /> <br />a. The typical street section for the public street/cul-de-sac accessing Lots1 <br />through 8 shall include an 8-foot wide Public Service Easement (PSE) <br />measured from the back of curb. Unless otherwise approved by the City <br />fivetwo percent <br />Engineer, the first feet of the easement shall be graded at <br />towards the street. <br /> <br />b. The water, stormdrain system, and gravity sanitary sewer mains shall be <br />public and maintained by the City. There shall be individual sanitary <br />sewer and water laterals to each dwelling unit. The gravity sanitary sewer <br />lateral shall have a two-way cleanout located at the back of curb. All <br />two <br />water services shall be inches unless otherwise approved by the City <br /> <br />Engineer. <br /> <br />c. The width of the court/street between Foothill Road and the Old Foothill <br />Road shall be increased to allow sufficient width for two, 12-foot wide exit <br />lanes and a 16-foot wide entrance lane. <br /> <br /> d. Old Foothill Road. <br /> <br />The project developer shall: <br /> <br />? <br /> Construct an earth swale along the westerly edge of pavement to <br />capture surface drainage along the roadway. <br />? <br /> Unless otherwise required by the City Engineer based upon further <br />information from P.G. & E., the project developer shall underground <br />the overhead utility lines along Old Foothill Road as determined to the <br />satisfaction of the City Engineer. <br />? <br /> Improvements to Old Foothill Road shall include a slurry seal or <br />overlay as determined by the City Engineer, if any. If an overlay, a <br />pro-rata cost sharing shall be established between the project <br />developer and the City. <br /> <br />e. Foothill Road <br /> <br />The project developer shall: <br /> <br />? <br /> Construct the new street tie-in to Foothill Road as shown on the plans <br />(except as modified above). <br />? <br /> Re-stripe the median striping to create a left turn pocket into the <br />development. <br />? <br /> Shorten the existing raised median north of the proposed entrance <br />street/court as determine by the City Engineer to allow for a smooth <br />transition while exiting the proposed street/court. <br /> <br />2 <br /> <br />