My WebLink
|
Help
|
About
|
Sign Out
PC-2007-08, PUD-85-10-7M, SHUTTS-GOBLE-PEET'S
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-08, PUD-85-10-7M, SHUTTS-GOBLE-PEET'S
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:44 AM
Creation date
8/30/2007 11:31:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/14/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pouring), if it can be demonstrated to the satisfaction of the Planning Director that the <br />construction and construction traffic noise will not affect nearby residents. All <br />construction equipment must meet Department of Motor Vehicles (DMV) noise standards <br />and shall be equipped with muffling devices. <br />42. A construction trailer shall be allowed to be placed on the project site for daily <br />administration/coordination purposes during the construction period. At no time shall <br />campers, trailers, motor homes, or any other vehicle be used as living or sleeping quarters <br />on the construction site. All such vehicles shall be removed from the site at the end of <br />each workday. <br />43. All excess soil from the site shall be off-hauled from the site and disposed of in a lawful <br />manner. No stockpiling of dirt on this site shall occur without specific review and <br />approval by the Planning Department. <br />44. Dust and mud shall be contained within the boundaries of the property during times of <br />construction. The project developer shall submit a dust control plan or procedure as part <br />of the building permit plans. <br />45. The project developer shall submit a waste generation disposal and diversion plan to the <br />Building and Safety Division prior to issuance of building or demolition permits. The <br />plan shall include the estimated composition and quantities of waste to be generated and <br />how the project developer shall recycle at least fifty percent (50%) of the job site <br />construction and demolition waste. Proof of compliance shall be provided to the Chief <br />Building Official prior to the issuance of final occupancy. During demolition and <br />construction, the project developer shall mark all trash disposal bins "trash materials <br />only" and all recycling bins "recycling materials only". The project developer shall <br />contact Pleasanton Garbage Service for all waste disposal. Only that portion of trash and <br />recycling waste refused by Pleasanton Garbage Service shall be disposed of or diverted <br />by another trash/recycling company. <br />46. The height of the building shall be surveyed and verified as being in conformance to the <br />approved building height as shown on Exhibit A or as otherwise conditioned. Said <br />verification is the project developer's responsibility, shall be performed by a licensed land <br />surveyor or civil engineer, and shall be completed and provided to the Planning <br />Department before the first framing or structural inspection by the Building and Safety <br />Division. <br />47. The applicants shall submit a pad elevation certification prepared by a licensed land <br />surveyor or registered civil engineer to the Chief Building Official and Planning Director, <br />certifying that the pad elevations and building location (setbacks) are pursuant to the <br />approved plans, prior to receiving a foundation inspection for the structure. <br />48. Final inspection by the Planning Department is required prior to occupancy. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.