My WebLink
|
Help
|
About
|
Sign Out
ORD 1958
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
8/28/2007 2:34:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/21/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1958
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 1958 <br />Page 10 of 17 <br />54. The developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the developer agrees and acknowledges that building permit approval <br />may be withheld if sewer capacity is found by the City not to be available. <br />55. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the developer is participating in the program. Notwithstanding <br />the developer's participation in such a program, the City may withhold building permits if <br />the City determines that sufficient water is not available at the time of application of <br />building permits. <br />56. The office building shall be designed and constructed to maintain an interior noise level <br />of 45 dBA Lam. Information sufficient to determine that this noise level can be met shall <br />be submitted with the plans submitted for issuance of building permits and shall be <br />subject to review and approval by the Planning Director and Chief Building Official prior <br />to issuance of building permits. <br />GREEN BUILDING <br />57. The subject building shall achieve at least a LEEDT"" "Certified" level on the LEED Green <br />Building Checklist at the time of building permit submittal. A final list of the green <br />building measures shall be submitted in conjunction with the plans submitted for <br />issuance of building permits and shall be subject to the review and approval by the <br />Planning Director prior to issuance of building permits for the project. <br />58. The proposed LEEDT"" Green Building Checklist shall be shown on one of the first two <br />pages of the plans submitted for the issuance of a building permit. The sheet number(s) <br />where each checklist item is addressed in the plan set shall be noted on the checklist. <br />All proposed green building measures shall be shown throughout the plan set, as <br />appropriate, as determined by the Planning Director and the Chief Building Official. <br />59. The Building and Safety Division may require special plan check or inspections for the <br />green building measures proposed. If required, the applicant shall provide verification to <br />the Planning Department clearly stating that the Building and Safety Division approved <br />all applicable requirements relating to green building measures. Said verification shall <br />be provided prior to occupancy. <br />60. The applicant shall implement the following measures with the construction of the office <br />building covered by this approval so that aroof-mounted photovoltaic system can be <br />installed in the future: <br />a. Install electrical conduit and pull string from the roof/attic areas to the <br />building's main electrical panel; <br />b. Engineer the roof trusses to handle an additional load as determined by a <br />structural engineer to accommodate the additional weight of a typical <br />photovoltaic system beyond that anticipated for roofing; and <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.