Laserfiche WebLink
P~RT B <br /> <br /> ESTIMATED COST OF MAINTENANCE <br /> <br /> Electrical Costs $ 725.00 <br /> Water Costs 6,500.00 <br /> Maintenance 12,000.00 <br /> Plant Replacement/Repair of <br /> Vandalism 3,000.00 <br /> SUBTOTAL = $22,225.00 <br /> <br /> City Administration Fee $ 1,200.00 <br /> County Fees for Collection <br /> of Assessments 1.200.00 <br /> SUBTOTAL = $24,625.00 <br /> <br /> ,Cost of Landscape <br /> Proposed Improvements $ 3,500.00 <br /> GRAND TOTAL = $28,125.00 <br /> <br /> Existing Surplus 7.518.00 <br /> $20,607.00 <br /> <br /> Required Assessment <br /> Cost Per Unit $20.607.00 <br /> 343 units <br /> <br /> = $ 60.08 <br /> <br />,Landscape Improvements proposed include weed abatement on sloped <br />areas adjacent to the masonry soundwall, additional tree and <br />shrub plantings, improvements to the irrigation system to reduce <br />vandalism, and ground cover reseeding of flat, open areas near <br />the Zone 7 access road. <br /> <br />(pwassess.'m11) <br /> <br />SR:88:350 <br /> <br /> <br />