Laserfiche WebLink
EXHIBIT B <br /> <br /> PROJECT ELEMENTS INCLUDED IN NORTH PLEASANTON <br /> IMPROVEMENT DISTRICT NO. 3 TO ACCOMMODATE BART <br /> <br />CATEGORY A: <br /> <br />Hopyard/I-580 Interchange <br /> <br /> 1. Construct the new northbound, three-lane bridge to <br /> accommodate BART. <br /> <br />Auxiliary Lanes from 1-680 to Hopyard Road <br /> <br /> 1. Acquire portions of the right of way on south side of <br /> 1-580 to accommodate future freeway widening for BART. <br /> <br /> 2. Construct south side embankment to accommodate future <br /> portions of the freeway widening required for BART. <br /> <br />CATEGORY B: <br /> <br />Hacienda Drive/I-580 Interchange <br /> <br /> 1. Acquire right of way on south side of 1-580 to <br /> accommodate new interchange bridge and structure to <br /> accommodate BART. <br /> <br /> 2. Construct the new first stage interchange bridge to <br /> accommodate BART. <br /> <br />Santa Rita - Tassajara Road/I-680 Interchange <br /> <br /> 1. Acquire portions of the right of way on south side of <br /> 1-580 to accommodate future freeway widening for BART. <br /> <br /> 2. Construct the new three-lane bridge to accommodate BART. <br />Auxiliary 5anes from Hopyard Road to Santa Rita Road <br /> <br /> 1. Acquire portions of the right of way on south side of <br /> 1-580 to accommodate future freeway widening required <br /> for BART. <br /> <br /> 2. Construct south side embankment to accommodate future <br /> portions of the freeway widening required for BART. <br /> <br />The estimated value of the improvements included in the NPID No. <br />3 projects to accommodate BART is as follows: <br /> <br /> <br />