My WebLink
|
Help
|
About
|
Sign Out
RES 88333
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2012 2:20:41 PM
Creation date
12/1/1999 12:09:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/19/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> <br /> PROJECT ELEMENTS INCLUDED IN NORTH PLEASANTON <br /> IMPROVEMENT DISTRICT NO. 3 TO ACCOMMODATE BART <br /> <br />CATEGORY A: <br /> <br />Hopyard/I-580 Interchange <br /> <br /> 1. Construct the new northbound, three-lane bridge to <br /> accommodate BART. <br /> <br />Auxiliary Lanes from 1-680 to Hopyard Road <br /> <br /> 1. Acquire portions of the right of way on south side of <br /> 1-580 to accommodate future freeway widening for BART. <br /> <br /> 2. Construct south side embankment to accommodate future <br /> portions of the freeway widening required for BART. <br /> <br />CATEGORY B: <br /> <br />Hacienda Drive/I-580 Interchange <br /> <br /> 1. Acquire right of way on south side of 1-580 to <br /> accommodate new interchange bridge and structure to <br /> accommodate BART. <br /> <br /> 2. Construct the new first stage interchange bridge to <br /> accommodate BART. <br /> <br />Santa Rita - Tassajara Road/I-680 Interchange <br /> <br /> 1. Acquire portions of the right of way on south side of <br /> 1-580 to accommodate future freeway widening for BART. <br /> <br /> 2. Construct the new three-lane bridge to accommodate BART. <br />Auxiliary 5anes from Hopyard Road to Santa Rita Road <br /> <br /> 1. Acquire portions of the right of way on south side of <br /> 1-580 to accommodate future freeway widening required <br /> for BART. <br /> <br /> 2. Construct south side embankment to accommodate future <br /> portions of the freeway widening required for BART. <br /> <br />The estimated value of the improvements included in the NPID No. <br />3 projects to accommodate BART is as follows: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.