My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
082107
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2007 3:12:28 PM
Creation date
8/16/2007 3:12:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/21/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Roof drains shall discharge and drain away from the building foundation to <br />an unpaved area wherever practicable. <br />Stormwater Construction Requirements <br />94. The project development shall submit a Stormwater Pollution Prevention Plan <br />(SWPPP) for review and approval by the City Engineer prior to issuance of <br />building or grading permits. Failure to comply with the approved construction <br />SWPPP may result in the issuance of correction notices, citations or stop work <br />order. The following construction Best Management Practices (BMPs), as well <br />as any other applicable measure, shall be included in the SWPPP and <br />implemented as approved by the City. <br />95. The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br />a. The project developer shall include erosion control/storm water quality <br />measures on the final grading plan which shall specifically address <br />measures to prevent soil, dirt, and debris from entering the storm drain <br />system. Such measures may include, but are not limited to, <br />hydroseeding, hay bales, sandbags, and siltation fences and are subject <br />to the review and approval of the City Engineer/Chief Building Official. If <br />no grading plan is required, necessary erosion control/storm water quality <br />measures shall be shown on the site plan submitted for an on-site permit, <br />subject to the review and approval of the Chief Building Official. The <br />project developer is responsible for ensuring that the contractor is aware <br />of and implements such measures. <br />b. All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved <br />erosion control/storm water quality measures are in place, subject to the <br />approval of City Engineer/Chief Building Official. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br />c. Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters <br />that could contribute to storm water runoff pollution. <br />d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />is <br />
The URL can be used to link to this page
Your browser does not support the video tag.