My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
082107
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2007 3:12:28 PM
Creation date
8/16/2007 3:12:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/21/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50. Portable toilets used during construction shall be emptied on a regular basis as <br />necessary to prevent odor. <br />51. All backflow prevention devices, above ground irrigation controls, and above <br />ground irrigation meters shall be located and screened so as to minimize visual <br />impacts. The location of all backflow prevention devices, above ground irrigation <br />controls, and above ground irrigation meters and the quantity and type of <br />proposed landscape screening shall be subject to the review and approval of the <br />Planning Director prior to installation. <br />52. All parking spaces shall be striped. Wheel stops shall be provided unless the <br />spaces are fronted by raised concrete curbs, in which case sufficient areas shall <br />be provided beyond the ends of all parking spaces to accommodate the <br />overhang of automobiles. <br />53. Prior to issuance of a building permit, the developer shall pay the required <br />commercial development school impact fee as prescribed by state law and as <br />adopted by the Pleasanton Unified School District. <br />54. The developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval <br />of this case, and that the developer agrees and acknowledges that building <br />permit approval may be withheld if sewer capacity is found by the City not to be <br />available. <br />55. This approval does not guarantee the availability of sufficient water to serve the <br />project. The City shall withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is in effect, unless the <br />City has adopted a water offset program and unless the developer is participating <br />in the program. Notwithstanding the developer's participation in such a program, <br />the City may withhold building permits if the City determines that sufficient water <br />is not available at the time of application of building permits. <br />56. The office building shall be designed and constructed to maintain an interior <br />noise level of 45 dBA Lam. Information sufficient to determine that this noise level <br />can be met shall be submitted with the plans submitted for issuance of building <br />permits and shall be subject to review and approval by the Planning Director and <br />Chief Building Official prior to issuance of building permits. <br />GREEN BUILDING <br />57. The subject building shall achieve at least a LEEDTM "Certified" level on the <br />LEED Green Building Checklist at the time of building permit submittal. A final <br />list of the green building measures shall be submitted in conjunction with the <br />plans submitted for issuance of building permits and shall be subject to the <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.