Laserfiche WebLink
Audiences: Downtown visitors <br />Budget: <br />$5,000 - $10,000 per bench <br />Timeframe for Construction: <br />Design: six months <br />Fabrication and installation: six months <br />Site requirements/constraints: <br />The site must warrant a bench, as a location where pedestrians might wish to pause and sit. Parks are <br />natural settings for benches and should be the highest priority site for the City's unique bench program. <br />Public Works or other sponsoring departments must prepare the site for attachment and foundation <br />requirements. <br />Potential Co-sponsors, Partners, Collaborators: Local merchants and property owners <br />22 <br />