My WebLink
|
Help
|
About
|
Sign Out
07 ATTACHMENT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
082107
>
07 ATTACHMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2007 3:08:31 PM
Creation date
8/16/2007 3:08:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/21/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
07 ATTACHMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Northern Gateway <br />Location: Southeast corner of Main Street and Vervais <br />Summary Description: There is significant interest in reinforcing the idea of downtown as a distinct <br />area, through identification of entries and gateways at the northern and southern edges of Main Street. <br />The Main Street Bridge already serves as a de-facto gateway and point of arrival and/or departure. At <br />this location, the Arroyo and the bridge serve as a boundary and avisual/physical experience for all <br />coming into and leaving downtown. The Master Plan for the Downtown Parks and Trails System <br />recommends "the bridge should be a major entry gateway to the downtown area." While there are some <br />opportunities for the bridge to accommodate public art, another possibility is the setback between Del <br />Valle Parkway and the fence, where a small brick pad already is in place. This site is well placed for a <br />sculpture of medium scale that would be visible to pedestrians and those riding in vehicles. <br />19 <br />Type of Project: Sculpture <br />
The URL can be used to link to this page
Your browser does not support the video tag.