My WebLink
|
Help
|
About
|
Sign Out
RES 88549
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 2:54:00 PM
Creation date
11/30/1999 11:30:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/6/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2.6 Right-of-Way Engineering <br /> <br /> 2.6.1 Based on approved layouts from Task 1.5, prepare legal descrip- <br /> tions and plat maps for property and easement acquisitions for <br /> project facilities. <br /> <br /> 2.6.2 After staff review, submit to site property owner and attend <br /> meeting to address questions. <br /> <br /> P~LASE 3 FINAL DESIGN <br /> <br />Task 3.1 Prepare Plans} Specifications and Estimates (PS&E) <br /> <br /> 3.1.1 Prepare reservoir, access road and utility corridor construc- <br /> tion plans with civil, structural, mechanical, electrical/ <br /> t eleme try/controls, and eros ion control and lands caping <br /> details, incorporating applicable City Standards Details. <br /> <br /> 3.1.2 Prepare Transmission Main plan and profile, Tassajara-Santa <br /> Rita/I-580 I/C crossing details, installation details for <br /> approved alternate pipe materials, typical details for appur- <br /> tenances and traffic control details incorporating City <br /> Standard Details as appropriate. <br /> <br /> 3..1.3 Prepare specifications incorporating City Standards as appro- <br /> priate. <br /> <br /> 3.1.4 Progress submittals: Three sets of Plans and Specifications at <br /> 50 percent and 90 percent completion. <br /> <br /> 3.1.5 Perform constructibility review. <br />Task 3.2 En~ineer's Construction Cost Estimate <br /> 3.2.1 Prepare Quantity take-off calculations. <br /> 3.2.2 Determine applicable estimated unit costs. <br /> 3.2.3 Prepare Engineer's Estimate <br />Task 3.3 Assist City in Obtainins Required Permits and Approvals <br /> <br />PMASE 4 BIDDIN(; <br /> <br />Task 4.1 Furnish Fifty (50) Complete Sets of Bid Documents <br /> <br />Task 4.2 Attend Pre-Bid Conference to Present Project and Answer <br /> Questions <br /> <br /> -5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.