Laserfiche WebLink
City of Pleasanton Proposal PR88056 <br />Geotechnical Investigation For October 5, 1988 <br />Road Failure"Evaluation Enclosure 1 <br />Pleasanton, California <br /> <br /> COST ESTIMATE <br /> ITEMIZED BREAKDOWN <br /> <br />ITEM ESTIMATED COST <br />Field Investigation <br /> <br />Drill Rig + 2 Operators: 20 Hrs. @ $132/Hr. $ 2,640.00 <br />Staff Geologist: 20 Hrs. @ $64/Hr. 1,280.00 <br />Senior Engineer: 4 Hrs. @ $80/Mr. 320.00 <br />Aluminum Pipes, Grouting & <br />Well Boxes for Inclinometer <br />Holes plus Handling: Lump Sum 1,820.00 <br /> SUB-TOTAL, FIELD: $ 6,060.00 <br /> <br />Laboratory Testing <br /> <br />In-Situ Moisture/Density: 40 @ $20 Each $ 800.00 <br />Direct Shear: 6 @ $135 Each 810.00 <br />Unconfined Compression: 4 @ $50 Each 200.00 <br />Consolidation: 2 @ $260 Each 520.00 <br /> SUB-TOTAL, LABORATORY:$ 2,330.00 <br /> <br />Inclinometer Readings & Data Interpretation <br />Reading frequency: once every one to two weeks for 6 months <br /> <br /> Inclinometer Use: 30 Hrs. @ $15/Hr. $ 450.00 <br /> Staff Engineer: 80 Hrs. @ $60/Hr. 4,800.00 <br /> Project Engineer: 15 Hrs. @ $74/Hr. 1,110.00 <br /> SUB-TOTAL, POST INSTALLATION, <br /> READINGS & EVALUATION: $ 6,360.00 <br /> <br />Geotechnical Evaluation & Report <br /> <br />Senior Engineer: 30 Hrs. @ $80/Hr. $ 2,400.00 <br />Staff Geologist: 20 Hrs. @ $64/Hr. 1,280.00 <br />Draftsman: 10 Hrs. @ $37/Hr. 370.00 <br />Word Processor/Clerical: 10 Hrs. @ $30/Hr. 300.00 <br /> SUB-TOTAL, OFFICE: $ 4,350.00 <br /> <br /> TOTAL: $19,100.00 <br /> <br /> ESTIMATED RANGE; $18,000 - $20,000 <br /> <br /> BSK <br /> & Associates <br /> <br /> <br />