Laserfiche WebLink
Task 2-2.3: Estimates and Bid Proposal <br /> <br />Perform detailed quantity takeoffs including item descrip- <br />tions and units in conformance with Caltrans BEES format and <br />requirements. Develop unit cost information from Caltrans <br />Contract Cost Data and local sources. Prepare engineer's <br />estimate showing items, quantities, costs, and total project <br />construction cost. Develop a bid proposal for inclusion in <br />the bidding documents for use by contractors in preparing <br />and submitting construction bids. <br /> <br />Task 2-2.4: Final Design Surveys <br /> <br />Perform field surveys to collect data for final design. <br />Provide one update of existing topography in areas of recent <br />construction. Prepare and file a Caltrans monumentation <br />map. Installation and establishment of permanent monumen- <br />tation for any purpose is not included as part of this work <br />scope. <br /> <br />TASK 2-3: FINALIZE PS&E <br /> <br />The purpose of this task is to respond to the review com- <br />ments of the 90 percent complete PS&E by the CITY, Caltrans <br />District 4, Caltrans Headquarters, FHWA and other required <br />agencies. A meeting with the CITY, Caltrans and the CON- <br />SULTANT will be held to establish a list of mutually agreed <br />upon changes. The CONSULTANT shall then make such changes <br />to the satisfaction of Caltrans. Subsequent revisions re- <br />quired by additional reviews after incorporation of these <br />modifications shall be considered extra work. Provide one <br />set of final original special provisions and estimate, and <br />one set of full size final composite mylar plan sheets to <br />the CITY. <br /> <br />TASK 2-4: BIDDING ASSISTANCE <br /> <br />The purpose of this task is to assist the CITY during the <br />bidding phases of the project. The work will include the <br />following tasks: <br /> <br />Task 2-4.1: Pre-bid Assistance <br /> <br />Respond to bidder questions for design clarification during <br />each bidding period and issue written clarifications or ad- <br />denda to the bidders if necessary in a timely manner. Attend <br />one pre-bid meeting for each bid period and respond to ques- <br />tions or comments by the contractors. <br /> <br /> - 7 - <br /> <br /> <br />