Laserfiche WebLink
Pleasanton Sports & Recreation Park <br /> Phase V <br /> BID LIST <br /> <br /> Est. Item <br />Item Item of Work Unit Qty. Price Total <br />Phase. v (Area 4 ) <br /> <br /> 1 Demolition L.S. L.S. 39,928.95 39,928.95 <br /> 2 Clearing & Grubbing L.S. L.S. 10,000.00 10,000.00 <br /> <br /> 3 Rough Grading/Earthwork L.S. L.S. 25,783.00 25,783.00 <br /> <br /> 4 15" RCP L.F. 1,090 18.40 20,056.00 <br /> 5 10" CP L.F. 925 19.00 17,575.00 <br /> 6 12" RCP L.F. 1,318 16.50 21,747.00 <br /> 7 Curb Inlet 'EA 5 1,645.00 8,225.00 <br /> 8 Catch Basin EA 29 1,020.00 29,580.00 <br /> 9 PCC Vertical Curb (18") L.F. 4,040 8.00 32,320.00 <br /> 10 PCC Curb & Gutter L.F. 640 9.00 5,760.00 <br /> 11 Curb & Gutter Removal L.F. 12 9.00 108.00 <br /> 12 3" AC on 9" AB Pavement S.F. 77,180 1.40 108,052.00 <br /> 13 AC Pavement Removal S.F. 155 .40 62.00 <br /> 14 6" PVC L.F. 275 9.40 2,585.00 <br /> 15 AC Handicap Ramp EA 2 55.00 110.00 <br /> 16 Signage & Pavement <br /> Striping L.S. L.S. 5,955.00 5,955.00 <br /> 17 Turf Block S.F. 645 4.00 2,580.00 <br /> 18 Fire Access Gate <br /> Barricade EA 1 660.00 660.00 <br /> <br /> 19 Junction Box EA 5 1,020.00 5,100.00 <br /> <br /> <br />