Laserfiche WebLink
LABORATORY TESTS <br /> <br /> (Unit charge for Laboratory testing including the normal Laboratory work and reporting of results <br /> only. Unusual or time-consuming sample preparation or special tests are billed at hourly charge <br /> for the Laboratory technician. Charges for testing which are not Listed wilt be given upon <br /> request. Similarly, a reduction of the fee schedule rate can be given for a Large number of <br /> tests). <br /> <br /> Billing Billing <br /> Rate/Test Rate/Test <br /> CLassification Tests Strength Tests <br /> Attarberg Limits (P! & LL) . . . $ 95 (including moisture content and <br /> Sieve Analysis ......... 73 dry unit weight determinations) <br /> Percent Passing #200 Sieve . . . 36 Direct Shear, per point <br /> Hydrometer Analysis ...... 87 a. Undisturbed ........ $ <br /> Sand Equivalent ........ 77 b. RemoLded .......... <br /> Specific Gravity ........ 93 TriaxiaL Compression, per point <br /> Bulk Specific Gravity ...... 80 a. Unconsolidated, undrained 95 <br /> Noisture Content/Unit Veight . . 10 b. Unconsolidated, undrsined <br /> Compaction Curves and backsaturated ..... 159 <br /> a. 4" mold ........ 145 c. Consolidated, undrained . . 170 <br /> b. 6" mold ........ 172 d. Consolidated, undrained and <br /> c. CaL impact (wet) . . . 145 backsaturated ....... 217 <br /> d. CaL impact (dry) . . . 172 e. Consolidated, drained . . . 170 <br /> e. 1 Point Verification.. 61 f. Pore pressure measurements. <br /> Durability Factor g. RemoLded specimens, add, <br /> a. Fine ......... 137 per point ......... <br /> b, Coarse ........ 110 Unconfined compression <br /> R-value Tests a, Undisturbed ........ 61 <br /> Not requiring reproportioning, , 192 b. RemoLded .......... 97 <br /> Requiring reproportioning .... 216 Consolidation Tests <br /> Cement, Lime, other ....... 216 (including moisture content end dry <br /> Concrete-Tests unit weight determinations) <br /> a, Compression tests, set a. Undisturbed ........ 145 <br /> of three specimens . . 35 b. Remotded .......... 181 <br /> b. Trial batch ...... 580 c. Time compression curve, <br /> Shrink-Swell Tests per increment ....... <br /> (including moisture content and dry <br /> unit weight determinations) <br /> a. Undisturbed ...... <br /> b. RemoLded ....... 114 <br /> <br /> SPECIAL CONDITIONS <br /> <br />In the event that the CLient requests termination of the work prior to completion of a report, we <br />reserve the right to complete such analyses and records as are necessary to place our files in <br />order and, where considered by us necessary to protect our professional reputation, to complete a <br />report on the work performed to date, A termination charge to cover the cost thereof in an amount <br />not to exceed 30 percent of all charges incurred up to date of the stoppage of the work may, st <br />the discretion of BERLOGAR GEOTECHNZCAL CONSULTANTS, be made. <br /> <br />ALl work including Letters and reports prepared by SERLOGAR GEOTECHNICAL CONSULTANTS shall remain <br />the sole property of BERLOGAR GEOTECHN|CAL CONSULTANTS until payment in full is received. <br /> <br /> LIN~TATZONS <br /> <br /> BERLOGAR GEOTECHNICAL CONSULTANTS provides services in the field of <br /> Soil Engineering Engineering Geology, in accordance with presently <br /> accepted professional practices. No warranty, either expressed or <br /> implied, is granted as part of performance of our work. <br /> <br />For any damage on account of any error, omission or other professional negligence, our liability <br />wilt be Limited to a sum of $50,000 or our fee, whichever is greater. <br /> <br />In the event the CLient makes a claim against BERLOGAR GEOTECHNICAL CONSULTANTS at law or <br />otherwise, for any alleged error, omission or other acts arising out of the performance of our <br />professional services, and the CLient fails to prove such claim, then the Client shall pay all <br />costs incurred by BERLOGAR GEOTECNNICAL CONSULTANTS in defending itself against the claim. <br /> <br /> BILLING <br /> <br />Invoices will be issued every month, payable upon receipt, unless otherwise agreed. Client agrees <br />to pay on receipt all invoices not questioned within 10 days after mailing by BERLOGAR <br />GEOTECHNICAL CONSULTANTS. Any questions raised after this lO-day period will be answered by <br />BERLOGAR GEOTECHNICAL CONSULTANTS and should any credit be due, BERLOGAR GEOTECHNICAL CONSULTANTS <br />will apply the credit to future invoices, or if requested by CLient, refund any amount due. <br /> <br />A service charge of 2 perce~t per month (but not exceeding the maximum rate allowable by Law) will <br />be payable on any amounts not paid within 30 days, payment thereafter to be applied first to <br />accrued interest and then to the principal unpaid amount. Any attorney~s fees or other costs <br />incurred in collecting any delinquent amount shall be paid by the CLient. <br /> <br /> <br />