My WebLink
|
Help
|
About
|
Sign Out
RES 89127
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 4:36:41 PM
Creation date
11/29/1999 11:31:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ t. Agmt. Iio. 4-i179-C <br /> <br />shall be borne by CITY. CITY hereby acknowledges nhe receipt of <br />STATE's "Manual on High and Low Risk Underground Facilities <br />Within Highway Rights of Way". <br /> <br /> (8) If additional righ~ of way is required, to acquire <br />all necessary additional right of way that will permit full pos- <br />session and control of said right of way, and transfer it in fee <br />to STATE, at no cost to STATE, and subject to prior examination <br />and acceptance by STATE of the degree of title to be conveyed to <br />STATE. Full possession and control shall be obtained prior to <br />the date of acceptance by the STATE of maintenance and operation <br />of the highway facility. <br /> <br /> (9) If any existing public and/or private utilities <br />conflict with the construction of PROJECT, CITY will make all <br />necessary arrangements with the owners of such utilities for <br />their protection, relocation, or removal, and if there are costs <br />of such protection, relocation, or removal which STATE and/or <br />CITY must legally pay, CITY will bear the cost of said pro- <br />tection, reloca~ion, or removal, plus cost of engineering over- <br />head and inspection. If any protection, relocation, or removal <br />of utilities is required, such work will be performed in accord- <br />ance with STATE policy and procedure for those utilities within <br />STATE's existing or proposed right of way and in accordance with <br />CITY policy for those utilities outside STATE's existing or prO- <br />posed right of way. <br /> <br /> (10) To furnish evidence to STATE, in a form accepta- <br /> ble to STATE, that arrangements have been made for the pro- <br /> <br /> -4- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.