My WebLink
|
Help
|
About
|
Sign Out
2431
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1984
>
2431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:39 AM
Creation date
8/14/2007 8:29:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/22/1984
DOCUMENT NO
2431
DOCUMENT NAME
PUD-82-1-2D
NOTES
REYNOLDS AND BROWN
NOTES 2
DESIGN REVIEW 4 OFFICE/WAREHOUSING FACILITIES
NOTES 3
SE OWENS DR/ JOHNSON DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit "A" <br />Planning Commission Resolution No. 2431 <br />2/22/84 <br />1, That the development he substantially as shown on the <br />site plan, elevations and landscape plan, Exhibit A, <br />dated l/27/84 on file with the Planning Division. <br />2. That in approving the plans as submitted for case <br />PUD-82-1-2D, approval is also granted to case PUD- <br />. 80-14-2M, a modification to case PiJD-80-14, to allow <br />buildings H, C and D of case PUD-82-1-2D to be separated <br />by less than 40 ft. No other conditions of case PUD-80-14 <br />are modified by this action. <br />3. That the developer shall comply with all applicable con- <br />ditions of cases PUD-80-14, PiJD-82-1 and PUD-82-12. <br />4. That all truck traffic generated by the project including <br />trucks used in construction activities, shall utilize <br />only Hopyard Road between the subject site and I-580. <br />Once the Stoneridge/I-680 interchange is constructed <br />trucks may proceed southerly and westerly utilizing <br />Hopyard Road, Stoneridge Drive and streets in the Meyer <br />business park to the Stoneridge Drive/I-680 interchange. <br />Trucks shall use no other routes to reach the site. <br />5. That construction and implementation of traffic <br />improvement and mitigation measures in conjunction <br />with the development of the project shall be governed <br />as follows: <br />a. When the Level of Service, as described in <br />the Hiqhway Capacity Manual, HRB Report 87, <br />reaches LOS D (equal to or greater than 81~ <br />capacity), at any affected intersection or <br />intersections, the Developer shall begin to <br />implement feasible mitigation measures. <br />Affected intersections shall be the following: <br />Hopyard Road/Morse Drive <br />Hopyard Road/Owens Drive <br />Hopyard Road/I-580 eastbound and <br />westbound off-ramps <br />
The URL can be used to link to this page
Your browser does not support the video tag.