Laserfiche WebLink
31. That a sanitary sewer sampling manhole be proy~~edQ~~ the <br />sanitary sewer lateral unless therwise waivec$ by {~~]~ City <br />Engineer. <br />32. That prior to issuance of a building permit, <br />shall pay the applicable Zone and City Bonn <br />water meter cost for any water meters (irriga <br />directly related to a building permit. <br />33. That the developer dedicate to <br />right-of-way purposes those pa <br />to be public streets. <br />34. That the developer grant an ea <br />those parcels shown as public <br />and which are approved by the <br />which may be designated by the <br />the City far s ~e <br />reels of land i ~n <br />cement to tkye C" <br />service Basemen I( <br />3ity Engineer a pt <br />City Engineer. <br />35. That approval of the design fo the line, g <br />structural sections for the st Bets serving <br />ment be withheld pending final engineering <br />review by the City Engineer. <br />36. That vertical P.C.C. curbs and gutters be ', co <br />within this development unless otherwise app <br />City Engineer and that the cur and gutteY b <br />lithically with the sidewalk hen the sidewa <br />37. That all existing wells, Sept <br />tanks on the site be properly <br />prior to the start of grading <br />retains specific wells for ob <br />special approval is obtained <br />temporary use of an existing <br />Any wells designated for aban <br />during construction, are to b <br />permit obtained from Zone 7 b <br />38. That the haul route for all m <br />development be approved by th <br />start of any construction. <br />tanks or hold <br />Baled, filled. <br />perations wnle <br />ruction wells, <br />om the City En <br />11 for con$tru <br />nment or any w <br />destroyed in a <br />calling (415) <br />.erials to end <br />City Engineer <br />and <br />) not <br />E.) <br />parcels <br />d the <br />u } ~ mono- <br />s 'acent. <br /> <br />~ doned <br />Z 7 <br />e or <br />p ter. <br />s ountered <br />r e with a <br />m ~~ ' s <br />o the <br />