Laserfiche WebLink
20. That storm drainage swales, gutters, in et i~ d f ills, <br />and channels not within the area of a d di ~ p blic <br />street or public service easement appro ed I e' City <br />Engineer be privately maintained by the pr ~ wners <br />or through an association approved by t ~ <br />21. That approval of the water supply and d ~t ~{ system be <br />withheld pending final design and until ~h l„ per has <br />demonstrated to the satisfaction of the Ci ~ i eer that the <br />proposed system meets both the immediat a lj range require- <br />ments for supplying water in this area. I' <br />I <br />22. That the developer comply with any and 11 ~ ble require- <br />ments of the cross-connections control nd d 1" prevention <br />device programs required by the Califor is ~ i' trative Code, <br />Title 17. <br />~ <br />23. That approval for the number, type and oc d <br />' fire hydrants <br />be withheld pending final design, revie b Yj ' re Marshal, <br />and final review by the City Engineer. <br />24. That approval of the sanitary sewer sys em ~ " t held pending <br />final design and until the developer ha 'd ~3 r ued to the <br />satisfaction of the City Engineer that the q s' d system is <br />adequate, connects to an approved point pf ' s a ge, and meets <br />both the immediate and long-range requi em S', f the sanitary <br />system in this and all tributary areas. <br /> I <br />25. That the haul route for all materials t ',a $ I this develop- <br />ment be approved by the City Engineer p ~o dl, h' start of <br />any construction. <br />26. That approval of the storm drainage sys ~m ' t held pending <br />final design and until the developer ha 'd ri r' ted to the <br />satisfaction of the City Engineer that he ~ is adequate, <br />commects to an approved point of discha ~e ~ s' any and all <br />applicable requirements of the Alameda bu o d Control <br />District - Zone 7, meets any and all ap li k re quirements <br />of the Federal Emergency Management Flo d a rogram, and <br />meets the immediate and long-range requ ~re tI o this develop- <br />ment and all upstream areas intended to be } @' through <br />this development. ',~, <br />~ <br />27. That electric power distribution, gas d '~t tl ' Q , communication <br />service, and any required alarm systems ),he ~ 1' ed underground <br />in a joint utility trench unless otherw ide ~~ $' cally approved <br />by the City Engineer. <br />28. That the developer be responsible for t e ~ ~.' tion of the <br />street lighting system serving the deve op he street <br />lights shall be 70 watt, high pressure pd ~D' r units <br />mounted on galvanized steel poles with pu ' lace bases, <br />on the LS-1C schedule per City requirem nt' rp EI G.& E. <br />standard details unless otherwise speci lic ~I p roved. <br />Approval for the number, location, and yp ~i 1' ctroliers <br />shall be withheld pending final design hd V~ W', by the City <br />Engineer. <br />