Laserfiche WebLink
18. That the developer submit an erosion and n on <br />control plan or procedure as partiof the e .plans <br />prior to the final approach of the, develo <br />19. That the developer submit a dust control r cedure <br />as part of the improvement plans pjrior to ~ Ali :approval <br />of the development. <br />20. That storm drainage swales, gutters, inle ~t 6, and <br />channels not within the area of a',dedicat '1 ~' treet <br />or public service easement approved by th Weer be <br />privately maintained by the property owne t gh an <br />association approved by the City.',. I <br />21. That approval of the water supply',and dis i 'ystem be <br />withheld pending final design and ',until t ~ 'r has <br />demonstrated to the satisfaction c~f the C g " ~ x' that <br />the proposed system meets both the' immedi d ', '~. Ig-range <br />requirements for supplying water i~!n this <br />22. That the developer comply with anyj and al Ili A 'fie <br />requirements of the cross-connectijons con an l ckflow <br />prevention device programs required by th if ~' a <br />Administrative Code, Title 17. i <br />23. That approval for the number, typq and to m ~ 'ire <br />hydrants be withheld pending final design ie l 'the <br />Fire Marshal, and final review byithe Cit <br />i ih '~ <br />24. That approval of the sanitary sew r syste i ' ld <br />pending final design and until th~ d~velo as ' 'onstrated <br />to the satisfaction of the City E gineer th oposed <br />system is adequate, connects to ar~ approv i discharge, <br />and meets both the immediate and ong-ran q, ents of the <br />sanitary system in this and all t~ibutary s. <br />25. That if a sanitary sewer lift stai~ion is 11 or use <br />by the development and if it is a'cepted e for <br />maintenance and operation, an agr ement s b, ' ~pleted <br />between the City and the develope prior @ oval <br />of the development to the effect' hat the to Iwill <br />provide a maintenance and operati n fund 'um <br />ten year period. <br />I <br />26. That the haul route for all mater'als to Y ,I is <br />development be approved by the Ci y Engin ~I" ' 'o the <br />start of any construction. <br />~~ <br />I <br />_.- - __ _..__.T ___._ _ _ _. ___ __ <br />~:... <br />