My WebLink
|
Help
|
About
|
Sign Out
RES 89093
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 4:06:31 PM
Creation date
11/24/1999 9:56:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/21/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED CITY STAFF WORK PROGRAM <br /> <br />PHASE 1: ANNEXATION AND LAND USE FEASIBILITY STUDY <br /> <br /> Step 1: Inventory existing and planned public <br /> facilitieS, services and Level of Service standards <br /> which may be utilized to service the annexation area <br /> <br /> Step 2: Evaluate EDAW data collection and analysis <br /> <br /> Step 3: Summarize Opportunities and Constraints <br /> <br /> Step 4: Develop annexation and planning objectives <br /> <br /> Step 5: Develop potential land use alternatives <br /> <br /> Step 6: Evaluate land use alternatives re: objectives <br /> <br /> Step 7: Evaluate desirability of extending existing <br /> facilities and services to each land use alternative <br /> using existing Level of Service standards <br /> <br /> Step 8: Consult with other cities, counties, and special <br /> districts to develop alternative methods of providing <br /> required facilities and services <br /> <br /> Step 9: Evaluate desirability of providing alternative <br /> facilities and services to each alternative and <br /> resulting changes to City Level of Service standards <br /> <br /> Step 10: Produce City Council Staff Report summarizing <br /> advantages and disadvantages of annexing subareas <br /> assuming various land use alternatives <br /> <br />PHASE 2: REVIEW ENVIRONMENTAL IMPACT REPORT <br /> Step 12: Review Administrative Draft EIR <br /> Step 13: Public Review Period <br /> Step 14: Review Final EIR <br /> <br /> Step 15: Produce Planning Commission Staff Report <br /> Step 16: Planning Commission Public Hearings <br /> Step 17: Produce City Council Staff Report <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.