Laserfiche WebLink
16. That a separate water meter be provided to eacpi <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />17. That approval for the number, type and location <br />of fire hydrants be withheld pending final design, <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />18. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />19. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />20. That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all appli- <br />cable requirements of the Alameda County Flood Control <br />District - Zone 7, meets any and all applicable require- <br />ments of the Federal Emergency Management Flood Hazard <br />Program, and meets the immediate and long-range <br />requirements of this development and all upstream <br />areas intended to be drained through this tract, <br />21. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. <br />22. That the developer be responsible for the installa- <br />tion of the street lighting system within the <br />development. The street lights shall be 70 watt, <br />high pressure sodium vapor units mounted on gal- <br />vanized steel poles with poured in place bases, <br />on the LS-1C schedule per City requirements and <br />P.G.andE. standard details unless otherwise <br />specifically approved. Approval for the number, <br />location, and type of electroliers shall be <br />withheld pending final design and review by the <br />City Engineer. <br />- 3-- <br />