My WebLink
|
Help
|
About
|
Sign Out
2260
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:45 AM
Creation date
7/30/2007 11:16:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/12/1983
DOCUMENT NO
2260
DOCUMENT NAME
TRACT 5114
NOTES
CHANG SU-O LIN
NOTES 2
50 LOT RESIDENTIAL SUBDIVISION OF APPR. 9.6 ACRES OF LAND
NOTES 3
E. OF MUIRWOOD DR. BET. PEACAN COURT AND LEMONWOOD WAY.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ 1/12/83 <br />Tract 5114 <br />Page 3 <br />14, That the developer comply with any and all <br />applicable requirements of the cross-connections <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17. <br />15, That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit, <br />16. That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />17. That approval for the number, type and location <br />of fire hydrants be withheld pending final design, <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />18. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate,. <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />19, That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />20. That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all <br />applicable requirements of the Alameda County Flood <br />Control District - Zone 7, meets any and all appli- <br />cable requirements of the Federal Emergency Manage- <br />ment Flood Hazard Program, meets any and all appli- <br />cable requirements of Cal Trans, and meets the <br />immediate and long-range requirements of this <br />development and all upstream areas intended to be <br />drained through this tract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.