Laserfiche WebLink
27. That the developer submit a refundable cash bond <br />for hazard control prior to approval of the final map. <br />The amount of this bond will be determined by the <br />City Engineer. (Approximately $100 per lot - <br />$2500 minimum.) <br />28. That this development provide a safe and effective <br />circulation system for bicycles; pedestrians; and <br />where applicable, equestrians. These facilities <br />shall be designed and installed to the satisfaction <br />of the City Engineer and shall he separated from <br />vehicular traffic whenever possible. <br />29. That the developer submit detailed landscape and <br />irrigation plans as part of the improvement plans. <br />These plans should include a street tree planting <br />plan; landscape plans for medians, buffer strips, <br />and any right-of-way landscape areas; and an <br />irrigation plan with automatic controls. <br />