Laserfiche WebLink
21. That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all <br />applicable requirements of the Alameda County Flood <br />Control District, meets any and all applicable <br />requirements of the Federal Emergency Management <br />Flood Hazard Program, and meets the immediate and <br />long-range requirements of this development and all <br />upstream areas intended to be drained through this <br />tract. <br />22. That the grading and drainage plan include all <br />required information to satisfactorily effect the <br />abandonment of the existing storm drain channel <br />along the west side of the SPRR right-of-way <br />including alternate flow paths and outfalls. <br />23. That electric power distribution, gas distribution, <br />communication service, and any required alarm systerns <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. <br />24. That the developer be -responsible for the installa- <br />tion of the street lighting system within the <br />development. The street lights shall be 70 watt, <br />high pressure sodium vapor units mounted on gal- <br />vanized steel poles with poured in place bases, <br />on the LS-1C schedule per City requirements and <br />P.G.andE. standard details unless otherwise <br />specifically approved. Approval for the number, <br />location, and type of electroliers shall be <br />withheld pending final design and review by the <br />City Engineer. <br />25. That in-lieu park dedication fees be collected by <br />the City prior to approval of the final map at the <br />rate then in effect and for the total number of <br />lots in the final map, unless this requirement <br />has been otherwise satisfied. <br />26. That any existing assessment district, which the <br />property may be subject to, be cleared prior to <br />the approval of the final map or the developer <br />will cause a segregation to be completed in <br />conjunction with the final map. <br />