Laserfiche WebLink
12. That the haul route forrovedm~te~helCity Engineer <br />this development be app Y <br />prior to approval of the final map or the start of <br />any construction. <br />13. That the developer includ3Yprof1theIlgradingrplans. <br />and sediment control as p <br />lq, That the developer submit a dust cont°ro~oPa~proval <br />as part of the improvement plans p <br />of the final map. <br />15. That approval of th° water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to Yoeosed <br />satisfaction of the City Engineer that the p p <br />system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />16. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigaticn meters) not directly related <br />to a building permit. <br />1~, That a separate water meter be provided to each <br />lot of record within ttyiedCity Engineerless <br />otherwise approved by <br />lg, That approval for the number, type and location <br />of fire hydrants be `withheld pending final design, <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />19, That approval of the sanitary se`.aer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisf~emion °atgtratC,t~' <br />Engineer that the prcposed sys and <br />connects to an approved point. of discharge~uire- <br />meets both the immediate and long-range req <br />ments of the sanitary sewer system in this and all. <br />tributary areas. <br />Zp, mhat a separate sanitary sewer lateral be provided <br />to eackr lot of record within the develepment unless <br />otherwise approved by the City Engineer. <br />